Laserfiche WebLink
boa Scien ific Dulling- <br />JOB NO.: 420713DEF30155 <br />Report Time: <br />2400 <br />9 of 14 <br />COMPANY: Natural <br />Soda Inc <br />API JOB # <br />LOCATION: Rio <br />Blanco <br />WORK ORDER# <br />165814 <br />RIG NAME: Capstar <br />314 <br />FIELD: <br />Rio Blanco <br />STATE: I Colorado <br />Township: 1 <br />Sec. 26 T1S R98W <br />COUNTY: Rio <br />Blanco <br />I SECT\RANGE:j <br />I Rocky Mountain <br />WELL NAME: 10H <br />-1V <br />From Thursday, July 11, 2013 at 0000 to Thursday, July 11, 2013 at 2400 <br />DRILLING SUMMARY <br />Drillinci Parameters <br />Start Depth <br />1954.00 <br />Rotary Hours <br />0.83 <br />WOB <br />25 Pick <br />UP <br />I 68 <br />Slack Off <br />1 581 <br />SPM <br />End Depth <br />1986.00 <br />Circulating Hours <br />3.00 <br />RAB I <br />60 SPP <br />I 950 <br />FlowRate <br />410 -410 <br />1 125 <br />Total Drilled: <br />32.00 <br />Avg. Total ROP: <br />38.40 <br />Mud Data <br />Total Rotary Drilled: <br />32.00 <br />Avg. Rotary ROP: <br />38.40 <br />Type <br />Gel ac <br />PV <br />12 <br />SOLID 4 <br />Total Drilled Sliding: <br />0.00 <br />Avg. Slide ROP: <br />NA <br />Weight <br />8.9 <br />1 GAS 1 <br />0 <br />YP <br />8 <br />BHT' 87 <br />Slide Hours: <br />0.00 <br />1 Percent Rotary: <br />100.00 <br />Viscosity <br />38 <br />SAND <br />0 <br />PH <br />8.3 <br />Flow To 85 <br />Below Rotary Hrs. <br />24.00 <br />Percent Slide: <br />.00 <br />Chlorides <br />1600 <br />JWL 1 <br />12 <br />Oil % 0 <br />PERSONNEL <br />CASING <br />BHA <br />Lead Directional : <br />Tony Pershall Size I Lb /ft I Set Depth BHA # 5:9 7/8" Rock Bit, 7/8, 5 Stage, 2. <br />Bend, Pony Monel, Monel, HOS, Gap <br />Matthew Schlaegel Sub, Monel, 25 Joints HWDP, HYD <br />James Duncan JARS, 5 Joints HWDP, <br />Luke Kristy <br />Scientific Drilling <br />Signature: <br />Scott Claussen <br />In: 117.77 Incl. Out: 1 42.75 Azm.Out: 120.46 <br />Second Directional : <br />MWD Operatorl <br />MWD Operator2 <br />Directional Company: <br />Geologist: <br />Company Man: <br />Incl. In: <br />39.22 <br />m. <br />GENERAL COMMENT <br />Date <br />Start <br />Time <br />End <br />Time <br />Hours <br />Start <br />Depth <br />End <br />Depth <br />ctivity Code <br />COMMENT <br />11- Jul -13 <br />00:00 <br />15:00 <br />15.00 <br />1954 <br />1954 <br />Other standby <br />/ cementing <br />11- Jul -13 <br />15:00 <br />17:25 <br />2.42 <br />1954 <br />1954 <br />POOH POOH <br />11- Jul -13 <br />17:25 <br />17:50 <br />1 0.42 <br />1954 <br />1954 <br />Change BHA Change <br />BHA <br />11- Jul -13 <br />17:50 <br />20:10 <br />2.33 <br />1954 <br />1954 <br />TIH Tag <br />Cement @ 1910 <br />11- Jul -13 <br />20:10 <br />21:25 <br />1.25 <br />1954 <br />1954 <br />Circulating <br />Mu up <br />11- Jul -13 <br />21:25 <br />22:05 <br />0.67 <br />1954 <br />1954 <br />Reaming <br />Drill Cement <br />11- Jul -13 <br />22:05 <br />22:30 <br />042 <br />1954 <br />1970 <br />Drilling <br />Drilling - (W0B.25;GPM A10;RPM:45) <br />11- Jul -13 <br />22:30 <br />22:45 <br />0.25 <br />1970 <br />1970 <br />Circulating Circulating <br />11- Jul -13 <br />22:45 <br />23:10 <br />0.42 <br />1970 <br />1 1986 <br />IlDrilling <br />Drilling - (WOB:25;GPM -410;RPM:45) <br />11- Jul -13 <br />23:10 <br />24:00 <br />0.83 <br />1986 <br />1 1986 <br />lCirculating I Build <br />Vol. Pump LCM <br />WinSERVE 0 Daily Report License: NP2320 Daily Report for JOB #: 420713DEF30155 - Page 1 of 1 <br />