Laserfiche WebLink
Conclusion <br />The Natural Soda, Inc. 13H -R well was spudded on August 25, 2013 and was completed on <br />September 9, 2013. Drilling of the intermediate hole began on August 25, 2013 with the <br />KOP depth of 1400 feet MD KB being reached on August 28, 2013. The intermediate <br />casing was set to a depth of 2,230 feet MD KB, and cemented with a good to fair cement <br />bond across the encountered aquifer intervals up to 600 feet. Magnetic ranging <br />measurements determined that at the crossover point of 2,563 feet MD KB on the 13H -I <br />well, the course of the 13H -R well was 5.2 feet above from where it should be according to <br />prognosis. An attempt was made using timed - drilling while sliding downwards in an effort <br />to get the two well bores closer together at the connection point and failed. The well was <br />sidetracked and ST01 moved the well bore approximately one foot closer to the 13H -1 well. <br />Using a PDC bit, the ST02 made the connection with the 13H -R well within the prognosis <br />depth. On August 8, 2013, the drilling was completed on the 6.75 -inch horizontal section <br />from 2,230 feet to 2,559 feet MD KB (TD). The connection with the 13H -1 was made on <br />September 8, 2013. The lateral distance from the 13H -R casing shoe to the intersection of <br />the 13H -1 well is 352 feet; the lateral distance from the 13H -1 casing shoe to the <br />intersection of the 13H -R well is 321 feet. The lateral distance from the 13H- R /13H -1 <br />intersection and to the 13H -1 hole TD is 1,673 feet; the lateral distance from the 13H- <br />R/13H-1 intersection to the 13H -1 liner TD is 1,609 feet. <br />Daub & Associates, Inc. Page 7 of 7 13H -R Well Summary Report <br />