Laserfiche WebLink
January 15, 2014 C- 1982 - 056 /Foidel Creek Mine JDM <br />� • �' J.s. .ten- !.� .iyy. - - `azca -' - � r <br />2RT Thickener Site 2RT Thickener Borehole <br />The 22RT water monitoring borehole was on- going. A drill rig, drill pipe truck, back hoe, water tanks, and pump <br />were on site at the time of the inspection. No activity was being conducted at the time of the inspection. <br />22RT Borehole Site <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />The access roads to the 2 LT borehole and the 22RT borehole were stable and snow - covered at the time of the <br />inspection. Both access roads were accessible to the drill sites. No problems were noted during the inspection. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />