Laserfiche WebLink
January 14, 2014 C- 2009 - 087 /Peabody Sage Creek Mine JDM <br />f <br />�r �* - <br />v <br />Z f <br />rortai Gump 41 <br />Lower Sump <br />GENERAL MINE PLAN COMPLIANCE: <br />The dewatering wells installation has been completed as permitted under MR23. Electrical work on the <br />dewatering well pumps was ongoing during the inspection. No problems were noted during the installation. No <br />other permitting activities are ongoing at the site as activities are idle. <br />ROADS — Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br />All roads from the North facilities Area to the topsoil pile at the South Facilities Area were snow - covered but <br />plowed and accessible at the time of the inspection. Access roads to the areas of the Pond 004 watershed were <br />inaccessible due to snow cover. <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 4 <br />