My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-14_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2014-01-14_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:40 PM
Creation date
1/16/2014 4:46:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
1/14/2014
Doc Name
Tecnical Revsion 02 submittals
From
Tuttle and Associates
To
DRMS
Type & Sequence
TR2
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EROSION AND FUGITIVE DUST CONTROL PLAN <br />FOR STOCKPILES <br />IN THE PUEBLO EAST PIT <br />EXHIBIT F -3 Reclamation Plan <br />Technical Revision — 2014 <br />This Control Plan applies to: <br />1. Overburden (OB) and topsoil (TS) stockpiles and significant portions of <br />stockpiles which are completed and have no additional placement of soil, and <br />2. Those above stockpiles and portions of stockpiles which will remain in place for <br />longer than one year from their completion or from the date of this Plan (January <br />17, 2013), which ever is later. <br />The method of erosion control is revegetation with a hardy grass mix. The grass <br />revegetation goal is 60% ground coverage. <br />The preferred seeding dates for maximum germination success are February 151h to April <br />15`''. The back up seeding dates are September 15`t' to November 15th. <br />Existing stockpiles have developed vertical gullies from water erosion. Therefore the <br />piles lack horizontal ridges to hold moisture, seed, and mulch. <br />The method of revegetation is: <br />• Any weeds on stockpiles will be removed by mowing, pulling, or chemical <br />spraying. <br />• A track dozer will run vertically up and down the sides of the stockpile so the <br />tracks can imprint horizontal ridges in the soil. Where vertical gullies exist on the <br />stockpile, the dozer blade will be lowered to the depth of the gullies on the up run <br />and lifted on the down run. <br />• A designated seed mix will be hydro- sprayed on the pile. <br />• A designated wood cellulose fiber mulch and tackifier will be hydro- sprayed on <br />the pile at the perscripted rate. <br />• Those portions of stockpiles where seed did not germinate will be hydro- seeded <br />and mulched the next available seeding time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.