My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-11-04_PERMIT FILE - C1981022 (23)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981022
>
2013-11-04_PERMIT FILE - C1981022 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:36:24 PM
Creation date
1/13/2014 1:23:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Permit File
Doc Date
11/4/2013
Doc Name
CDOPH & E Air Pollution Control Permits
Section_Exhibit Name
Exhibit 2.03-E4 Part 4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oxbow Mining, LLC Colorado Department of Public Health and Environment <br />Permit No. 98GUO812 - Air Pollution Control Division <br />Initial Approval — Modification 6 <br />replace the control efficiency requirement on the final permit. (Reference: Regulation No. 3, Part <br />B, Section III.E.) <br />PROCESS LIMITATIONS AND RECORDS <br />This source shall be limited to the following maximum consumption, processing and /or <br />operational rates as listed below. Daily and Annual records of the actual process rate shall be <br />maintained by the applicant and made available to the Division for inspection upon request. <br />(Reference: Regulation 3, Part B, II.A.4) <br />Process /Consumption Limits <br />AIRS <br />Point <br />process Parameter <br />Annual Limit <br />Daily Limit <br />Controls <br />010 <br />Ventilation <br />8,760 hours <br />24 hours each <br />None <br />- -- <br />-- - -- <br />each <br />_ <br />7,000,000 <br />- - - -- <br />Stacking Tubes Transfer points <br />tons of coal <br />40,000 tons of <br />011 <br />8 -10 <br />all transfers <br />coal all transfers <br />Partial Enclosure <br />combined <br />ombined <br />7,000,000 <br />tons of <br />Partial Enclosure <br />012 <br />Reclaim Tunnel Transfer Points <br />tons of coal <br />11- 15 <br />all transfers <br />cooal al all ll transfers <br />combined <br />combined <br />7,000,000 <br />tons of <br />Partial Enclosure <br />013 <br />Screen Plant Transfer Points 16- <br />tons of coal <br />20 <br />all transfers <br />cooal al all ll transfers <br />combined <br />combined <br />Screen #1 (Kinergy model: <br />XDSNED- 120 -HD; sn: KDSN- <br />7,000,000 <br />5860) <br />tons of coal <br />40,000 tons of <br />14 <br />Screen #2 (Kinergy model: <br />total for both <br />coal all transfers <br />Full Enclosure <br />XDSNED- 120 -HD; sn: KDSN- <br />screens <br />combined <br />5861 <br />7,000,000 <br />Dump Station Transfer Points <br />tons of coal <br />40,000 tons of <br />015 <br />(21 -24) <br />all transfers <br />coal all transfers <br />Partial Enclosure <br />combined <br />combined <br />016 <br />Rock Loading <br />100,000 tons <br />274 tons <br />Partial Enclosure <br />051/0007/999 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.