Laserfiche WebLink
Oxbow Mining, LLC <br />Permit No. 98GU0812 - <br />Initial Approval - Modification 6 <br />Notes to Permit Holder: <br />Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />1) The production or raw material processing limits and emission limits contained in this permit are <br />based on the production /processing rates requested in the permit application. These limits may <br />be revised upon request of the permittee providing there is no exceedence of any specific <br />emission control regulation or any ambient air quality standard. A revised air pollution emission <br />notice (APEN) and application form must be submitted with a request for a permit revision. <br />2) This source is subject to the Common Provisions Regulation Part II, Subpart E, Affirmative <br />Defense Provision for Excess Emissions During Malfunctions. The permittee shall notify the <br />Division of any malfunction condition which causes a violation of any emission limit or limits <br />stated in this permit as soon as possible, but no later than noon of the next working day, followed <br />by written notice to the Division addressing all of the criteria set forth in Part II.E.1. of the <br />Common Provisions Regulation. See: <br />hftp://www.cdphe.state.co.us/regulations/airregs/5CCR1 001 -2. pdf. <br />3) The permit holder is required to pay fees for the processing time for this permit. An invoice for <br />these fees will be issued after the permit is issued. The permit holder shall pay the invoice within <br />30 days of receipt of the invoice. Failure to pay the invoice will result in revocation of this permit <br />(Reference: Regulation No. 3, Part A, Section VI.B.) <br />4) The emission levels contained in this permit are listed in the following table: <br />Emission Factors <br />PM <br />PM10 <br />PM2.5 <br />Emission <br />Emission <br />Emission <br />Factor <br />Factor <br />Factor <br />Control <br />Source ID <br />Ibs /ton <br />Ibs/ton) <br />(Ibs/ton) <br />Efficiency <br />Description of source <br />TP8 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Main Mine Portal conveyor to flop gate to stacking <br />tube 1 <br />a <br />a� <br />m <br />a� <br />TP9 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Main Mine Portal conveyor to flop gate to transfer <br />i <br />conveyor <br />c <br />0 <br />CL <br />C <br />C <br />P <br />TP10 <br />0.00023243 <br />0.00010993 <br />0,00003107 <br />85.0% <br />Transfer conveyor to stacking tube 2 <br />CM <br />TP11 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Mass flow hopper to reclaim conveyor <br />M <br />J <br />TP12 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Mass flow hopper to reclaim conveyor <br />TP13 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Mass flow hopper to reclaim conveyor <br />a° <br />TP14 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Mass flow ho er to reclaim conveyor <br />C <br />TP15 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.0% <br />Mass flow hopper to reclaim conveyor <br />12 m °' <br />F 12: <br />TP16 <br />0.00023243 <br />0.00010993 <br />0.00003107 <br />85.00% <br />Reclaim conveyor to screening plant <br />051/0007/999 Page 10 <br />