Laserfiche WebLink
SEDCAD 4 for Windows <br />7 <br />Peak Elevation: 6,170.19 R . <br />I <br />Dewater Time: 0.61 days <br />Oewatering time rs calculated from peak stage to lot vest spillway <br />Elevation <br />Area <br />(ac) <br />6,163.49 <br />0 1 <br />6,163.50 <br />0.1 <br />6,164.00 <br />0.18 <br />6,164.50 <br />0.19 <br />6,165.00 <br />0.20 <br />6,165.50 <br />0.21 <br />6,166.00 <br />0.23 <br />6,166.50 <br />0.24 <br />6,166.90 <br />0.24 <br />6,167.00 <br />0.25 <br />6,167.50 <br />0.26 <br />6,168.00 <br />0.270 <br />6,168.50 <br />0.28 <br />6,168.90 <br />0.29 <br />6,169.00 <br />0.29 <br />6,169.50 <br />0.31 <br />6,170.00 <br />0.330 <br />6,170.19 <br />0.338 <br />6,170.50 <br />0.349 <br />6,171.00 <br />0.368 <br />6,171.30 <br />0.380 <br />Elevation-C city- Discha rqe Table <br />Capacity D <br />Discharge D <br />Dewater <br />Time <br />(ac -ft) ( <br />(cfs) ( <br />(hrs) <br />Detailed Discharge Table <br />Combined <br />Elevation Drop Inlet Straight Pipe Total <br />(ft) (cfs) (cfs) <br />Discharge <br />(cfs) <br />6,163.49 0.000 0.000 0.000 <br />6,163.50 0.000 0.000 0.000 <br />6,164.00 0.000 0.000 0.000 <br />6,164.50 0.000 0.000 0.000 <br />6,165.00 0.000 0.000 0.000 <br />6,165.50 0.000 0.000 0.000 <br />6,166.00 0.000 0.000 0.000 <br />6,166.50 0.000 0.000 0.000 <br />Filename Pond D 2013 25 yr sc4 Printed 07 23 2013 <br />Filename Pond D 2013 25 yr sc4 Printed 07 23 2013 <br />