Laserfiche WebLink
Section - 2.05.3 <br />Sheets 1,2 and 3, General Facilities for a location of the facility and pipeline. The borehole will be <br />permitted with the Colorado Oil and Gas Conservation Commission (COGCC). The borehole well <br />string will consist of approximately 60' of 13 5 /e" steel casing. The pipeline will consist of <br />approximately 7000' of 14" HDPE pipeline. The pipeline will be buried in the road immediately west <br />of the portal area, but will come to the surface as it turns north and is routed cross - country. Certain <br />sections of the pipe may need to be buried where needed at road crossings, and as conditions warrant. <br />The pipeline will terminate at the Elk Creek Generator and Thermal Oxidation Facility. The methane <br />from the sealed mine will be used in the thermal oxidizer or the electric generator sets to supplement <br />the gas obtained from the Elk Creek Mine. <br />TR -75 2.05 -23e Rev. July 2013 <br />