My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-30_PERMIT FILE - C1982056A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-12-30_PERMIT FILE - C1982056A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:23 PM
Creation date
1/13/2014 9:42:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/30/2013
Doc Name
Pages 2.05-65 to 2.05-197.3 part 2
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) Topsoil. A narrative explaining the method of removal and the amount to be removed and the plan for <br />storage of topsoil, subsoil, and other material within the permit area subject to requirements of the topsoil removal <br />performance standards of 4.06.2. This narrative shall specify the depth of material to be salvaged from all disturbed <br />areas based on the soil information required by 2.04.9 and shall specify the volume of each type of material to be <br />salvaged. A map of any proposed storage structures shall accompany the narrative. The maps shall be prepared <br />according to the requirements of 2.10. <br />I0.301]m,"O <br />See response to 2.05.4, Reclamation Plan, below for details concerning the Foidel Creek Mine. TC does not propose to <br />disturb any additional land within the Fish Creek Tipple permit area. The Fish Creek Tipple and adjoining haulroad <br />were constructed prior to the promulgation of regulations mandating topsoil salvage and storage. Thus, the best <br />plant growth medium available is a mixture of spoil and soil materials which will be substituted for topsoil. This <br />situation is further discussed within the Fish Creek Tipple /Loadout Appendix, pages 2.04 -36 through 2.04 -38 and <br />pages 2.05 -37 through 2.05 -38 of Volume VIII. <br />Eastern Mining District Dewatering Facility - The Eastern Mining District Dewatering Facility will require <br />salvaging and stockpiling approximately 13,360 CY of topsoil from the access road and the facility site. During <br />upgrading of the road, approximately 3,600 CY of topsoil will be windrowed to the side of the road. The topsoil <br />along the length of the road is approximately 30 inches deep. The facility site will require salvaging and <br />stockpiling approximately 8,300 CY of topsoil. The topsoil from the site area is approximately 30 inches deep. A <br />test pit will be dug to verify the topsoil depth obtained from previous soil mapping work. The stockpiled topsoil, <br />which is located within the pad area, will be stabilized with the topsoil stockpile stabilizing seed mixture. <br />Additionally, approximately 6,295 CY of topsoil will be salvaged from the treatment pond site. This site has been <br />relocated closer to the road to facilitate delivery of chemicals. <br />Bleeder Fan - The bleeder fan facility will require salvaging and stockpiling approximately 4,700 CY of topsoil <br />from the access road and the facility site. During the upgrading of the road, approximately 2,800 CY of topsoil will <br />be windrowed to the side of the road and left in place. The 1,200 CY that will be salvaged from the road extension <br />will be placed in the stockpile that will be established on the fan pad. In addition to the topsoil stockpiled from the <br />road extension, approximately 740 CY will be salvaged and stockpiled from the pad. The soil resources <br />information was derived from information presented in Exhibits 7 and 8, Soil Profile Description and Soil Mapping <br />Unit Descriptions, Map No. 19, Mine No. 3, Soils presented in permit C -84 -062. These materials are incorporated <br />herein by reference. At the bleeder fan site, TC will establish a test pit to verify topsoil depths prior to salvaging <br />topsoil. The stockpiled topsoil, which is located within the pad area, will be stabilized with the topsoil stockpile <br />stabilizing seed mixture. Prior to salvaging any topsoil from the site, a T & E species reconnaissance for Ute <br />Lady's Tresses, Spiranthes diuvialis, will be conducted, and the results forwarded to the Division. It is not <br />anticipated that this species will be found, as the site appears to be outside of its natural range. <br />18 Right Ventilation Shaft (TR04 -44) <br />Approximately 4,400 feet of the access road crosses upland areas, with the remaining 2,700 feet crossing lowland <br />areas where road construction will involve removal of any large vegetation and stripping and stockpiling of other <br />vegetation, topsoil, and organic materials. Similarly, the shaft pad is located in an upland area. Given an average <br />topsoil depth of approximately 6 inches in the upland area and a total road disturbance area of approximately 5.7 <br />acres, approximately 4,600 cubic yards of topsoil will be salvaged from the road corridor, and 2,000 cubic yards <br />from the 2.5 acre pad area. Prior to initiating soil removal, the stream buffer zone will be marked with identifying <br />signs to prevent surface disturbance within buffer zone areas. The topsoil from the road corridor was initially <br />windrowed adjacent to the road and topsoil from the pad area was placed in a stockpile adjacent to the shaft pad and <br />within the road corridor, for future reclamation use. As a result of concerns related to protection of windrowed <br />topsoil from erosion and contain ination, a decision was made to recover topsoil from the windrows and place it in <br />stockpile. The topsoil salvage volumes are indicated on Table 49A. Seeding with the topsoil stockpile stabilization <br />seed mixture identified on page 2.05 -121 will stabilize the windrowed and stockpiled topsoil. <br />MR13 -273 2.05 -84.10 12/06/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.