My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-10_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-01-10_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:52 PM
Creation date
1/10/2014 10:17:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
1/10/2014
Doc Name
Adequacy Response #2
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR77
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Susan Burgmaier -3- January 7, 2014 <br />On top of gob pile #4 there is 11,400 CY of coverfill in stockpile. This material has come from <br />the TR -72/76 expansion area. Of the 90,000 CY that was originally calculated as available in <br />the TR -27/76 expansion area, there is more than likely some material still available for salvage, <br />but it is unknown how much. Therefore, to make sure enough material is available, almost <br />59,000 CY of material will be required from the gob pile #3 area. There is an estimated <br />123,000 CY excess soil at gob pile #3. (Once salvage efforts are complete at gob pile #3, this <br />number will be verified with a survey and Appendix A will be updated as necessary). <br />Topsoil is located in two piles, pile "D" and "E ". Topsoil stockpile D (west pile) has 4,524 CY <br />of topsoil in place. Topsoil stockpile E (East pile, at toe of gob pile #4, just west of gob pile #2) <br />has 37,948 CY in place, for a total amount of 42,472 CY of available topsoil. <br />C. Please provide an accurate map depicting where topsoil has been replaced and <br />the depth of topsoil replacement in each area. <br />BOW2: For material balance purposes, it is assumed that no topsoil has been placed in the <br />gob pile area. If that changes and it is field verified that topsoil is in place, AppendixA will be <br />revised. <br />6. DRMS: Please update Map 32, Topsoil Distribution Plan, to include the proposed <br />disturbance area associated with the gob pile expansion. <br />BOW -2: Please see revised Map 32. <br />Please feel free to call me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures: <br />Volume II: Map 32 <br />Volume IX: Text pages 14 -15, Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.