Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7' STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />January 7, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />1313 Sherman St., Room 215 RECEIVED <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine JAN 10 2014 <br />Technical Revision #77, Substitute Topsoil Plan <br />Adequacy Response #2 DIVISION OF RECLAMATION <br />Permit C -1996 -083 MINING AND SAFETY <br />Dear Ms. Burgmaier: <br />The DRMS' letter dated June 3, 2013 requested additional information. On behalf of Bowie <br />Resources, LLC, enclosed is the requested data. <br />During the Adequacy response it was determined that at this time, using co\erfill as an alternate <br />to topsoil is no longer required. Therefore, parts of this revision will be withdrawn. No updates <br />to pages 2.04 -101 & 102, 2.05 -50 will be required. Volume IX, Appendix A has been revised as <br />well as pages 14 -15 per DRMS request in number 5. <br />The Volume IX text and Map -32 will be undergoing two revisions at the same time, this revision, <br />and TR -85. To make sure changes from both are incorporated into the permit, the next revision <br />submitted will combine changes from both revisions to ensure inclusion of changes from both <br />revisions. <br />1. DRMS /BOW2: (This item had to do with revising text on page 2.04101 which will no longer <br />be included with this revision). <br />2. DRMS /BOW2: (This item had to do with revising text on page 2.04101 which will no longer <br />be included with this revision). <br />3. DRMS /BOW2: (This item had to do with revising text on page 2.04101 which will no longer <br />be included with this revision). <br />4. DRMS: BRL, in response to DRMS adequacy concerns, indicates that only coverfill <br />material was placed on the gob pile #1 and the first bench of gob pile #2 and that no topsoil <br />is intended to be replaced in these areas. However, during the May 30, 2013 meeting at <br />DRMS it was stated that some topsoil has been placed on these benches. BRL was unable <br />to indicate the depth or location of topsoil that was replaced on these areas. Given the <br />"coverfill" samples were taken from the first bench of gob pile #2 to justify its use as a soil <br />