Laserfiche WebLink
)),r E, P-P7-, <br />112c Annual Report <br />RECEIVED <br />Page 2 of 3 <br />JAN 09 2014 <br />WASION OF RECLAMATION <br />MININ ETY <br />Permittee Name: <br />Brannan Sand and Gravel <br />Com an , L.L.C. <br />Permit Number: <br />M- 1980 -183 v <br />Operation Name: <br />Pit 29 <br />County: <br />Adams <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />January 8, 2014 <br />Permit Acreage: <br />176.24 <br />Current Bond Amt: <br />$568,900.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />Total acres <br />Total acres <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />OYES.. NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />0 <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />mulched w/ <br />hauling <br />Z S 3 <br />4. <br />What was the date of last excavation, processing or activity at the mine? <br />5. <br />Does the mine operate more than 180 days per year? <br />+ YES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />YES aN <br />b) approval for INTERMITTENT OPERATION? <br />YES <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />—7 5 <br />8. <br />Number of acres that were newly affected during the current report year. <br />r <br />rate (tons /ac): <br />v <br />7 <br />9. <br />Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />D <br />seeded w/ <br />0 <br />w /topsoil <br />mulched w/ <br />v <br />1 <br />1 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />b <br />fertilized w/ <br />replacement <br />(� <br />rate (tons /ac): <br />v <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />application <br />Fertilizer <br />application <br />/ <br />Mulch <br />application <br />/� j ,%� A <br />" <br />method: <br />/ <br />method: <br />method: <br />/ <br />