Laserfiche WebLink
July 3, 2013 <br />Mr. Steve Fancher <br />LOVELAND READY MIX <br />P.O. Box 299 <br />Loveland, CO 80539 -0299 <br />us <br />Resurvey of Gas Line Monitoring Points Batch Plant Site, Weld County Road 54 CDS Project No. <br />P02 -1783 <br />Dear Mr. Fancher: <br />This letter is to state the results of the checking of the gas line monitoring points set in <br />March of 2002. <br />On May 16, 2013, a survey of Points 1 through 9 and 11 through 23 showed no significant <br />difference or movement from the original survey. During the last survey we discovered that Point <br />number 10 has been destroyed by some sort of construction and is no longer useable, during this <br />survey we discovered that monument number 19 has also been destroyed. <br />Currently, the extraction areas are adjacent to Points 1 through 23. <br />If you have questions regarding this information, please call our office. <br />Sincerely, <br />FOR AND ON BEHALF OF <br />CDS ENGINEERING CORPORATION <br />f/1 <br />G *chael J. DeDecker PLS 20676 <br />$rvey Supervisor <br />165'2,r,d Buret S.Vi!. ° Lovela9'd, `, —A-2c 30E3 '° (9 0) 66P T °��.) � c1 !t'j �� ° / -.� I...LL i/6V�PtI.L.,ds-en(g. ie <br />