My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-30_PERMIT FILE - C1982056A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-12-30_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:23 PM
Creation date
1/9/2014 10:50:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/30/2013
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
using conventional rotary drilling methods and drilling mud as the circulation medium to depths ranging from 1,300 <br />to 1,600 feet. <br />TRO Coal Quality Coreholes (MR13 -269) <br />TC proposes to develop appropriate access, construct drill -pads, and drill and log up to 4 coreholes in the Eastern <br />Mining District (EMD). The purpose of the proposed corehole program is to more accurately define the extent, <br />configuration, and quality of the Wolf Creek Coal Seam, and to assess overburden and coal physical and chemical <br />characteristics, for planning and implementation of possible future mining operations in this area. The proposed <br />activities will occur on lands, and will affect surface and minerals owned or controlled by TC, and would be <br />conducted during the fall and winter of 2013, as shown on Figure EX52 -F1, TRO Coal Quality Coreholes. <br />Environmental baseline studies, including cultural resource surveys and wildlife consultation with Colorado Parks <br />and Wildlife, have been completed for the proposed drill sites, and will be documented by a cultural resource <br />survey report and wildlife consultation letter, which will be forwarded on receipt. <br />Drill -sites have been selected and located to facilitate access from existing County and ranch roads. Minor <br />maintenance may be required for portions of the existing ranch roads, including grading to address rills or washouts <br />and placement of suitable road -base materials, to assure good access during any wet conditions and minimize any <br />road damage. Where direct access from existing roads is not feasible, drilling equipment and supplies may travel <br />overland short distances during periods when ground conditions are favorable to access the drill sites, or short <br />temporary connecting roads will be constructed. The maximum anticipated road construction requirements would <br />be approximately 1,500 feet (0.90 acres with a 25 ft. road width). <br />Drill pads will be approximately 75 x 75 feet (0.15 acres), with soil material stripping limited to an area around the <br />drillhole collar, and the area surrounding any mud pits necessary to support drilling operations, in order to minimize <br />disturbance and facilitate site reclamation. If additional site work is required to establish a level pad, any affected <br />areas will be stripped and the soil material stockpiled for use in reclaiming the site. Wattles, sediment fence, and /or <br />berms will be used to control site drainage and prevent off -site sediment transport. Nominal 4.805 -inch drillholes <br />will be completed using conventional rotary drilling methods and drilling mud as the circulation medium, to depths <br />ranging from 800 to 1,500 feet. Any drilling fluids will be fully contained on site using either mud pits or <br />temporary porta -pits. Core samples will be recovered from all drillholes, and all drillholes will be geophysically <br />logged. <br />On completion of drilling and logging, all drillholes will be plugged and sealed in accordance with State Engineer <br />requirements, and drill sites will be reclaimed by removing all equipment and supplies, allowing any mud pits to <br />dry -out, backfilling the pits, grading any disturbance to blend with the surrounding terrain and reestablish natural <br />drainage patterns, replacing stockpiled soil materials, and seeding with either the rangeland or dryland pasture seed <br />mixtures (dependent on the pre - disturbance vegetation community). <br />Mine Facilities <br />(a) A narrative and maps, to meet the standards prescribed in 2.10, describing the location <br />construction. modification, use, maintenance and removal of mine facilities in the permit area including all <br />buildings. structures and utility corridors. <br />RESPONSE <br />The existing Foidel Creek Mine surface facilities consist of building structures, material handling system, utilities. <br />and surface areas as shown on Map 24, Surface Facilities. Previously disturbed areas within the surface facilities <br />area may be leveled and then utilized for additional storage. <br />Buildings <br />The original mine administrative office, a 60 x 36 foot modular trailer structure, was modified to allow for the cold <br />weather and heavy snow -load of the area. That administrative structure contained eleven offices for the mine staff. <br />A second administrative office was subsequently added for mine staff. The 36 x 56 foot trailer was located west of <br />the original administrative office. The trailer contained a bathroom and was hooked up to the existing septic and <br />MR 12-269 2.05 -17.2 10/30/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.