My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-30_PERMIT FILE - C1982056A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2013-12-30_PERMIT FILE - C1982056A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:23 PM
Creation date
1/9/2014 10:50:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
12/30/2013
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 17 -Right through 24- Right, PR03 -06 and PR06 -07) <br />The same mining method utilized in the southern half of the NMD will be used to extract coal from the northern <br />half of this area. Existing surface facilities, including the EMD ventilation site, and 18 -Right and 6 -Main North <br />Ventilation Shafts and associated support facilities, will be used for mining of coal in this part of the NMD permit <br />area. <br />WMD (Panels 13 -Left through 17 -Left, PR06 -07, TR07 -63, TR08 -64, TR09 -68) <br />The same mining method utilized in the NMD will be used to extract coal from the WMD. The existing surface <br />facilities, including the 18 -Right and 6 -Main North Ventilation Shafts and associated support facilities, along with <br />the new 18 -Left Ventilation Installation, will be used for mining of coal in this part of the WMD permit area. <br />(2) Operation Description <br />(a) Surface mining. A detailed narrative description and appropriate map(s) prepared in <br />accordance with 2.10 describing the land to be affected within the permit area according � proposed sequence <br />of mining and reclamation. Each narrative and /or map shall include a detailed timetable sufficient to describe the <br />various mining phases proposed b the he applicant. the maximum acreage proposed for each phase of the operations <br />within the permit area must be specified. <br />RESPONSE <br />No surface mining is planned in this application. Therefore, the requirements of this Section are not applicable to <br />either the Foidel Creek operation or the Fish Creek Tipple operation <br />(b) Underground mining. A detailed narrative and appropriate map(s) prepared according to the standards <br />of 2.10, sufficient to describe all proposed surface disturbances to be associated with the underground <br />mining activities within the permit area. Each operation plan shall include a narrative, cross - sections, <br />map(s), and timetable(s) sufficient to describe the areal extent of the proposed underground workings <br />and the stratum to be affected. <br />RESPONSE <br />The mine portals are located in the NE'ANEIA Section 32, T5N, R86W, Routt County, Colorado. Currently, these <br />portals are the primary access to the mine for men and materials, utility services, and ventilation. Additionally, <br />another portal was driven northeast of the original portals, as shown on Map 23, Mine Plan. This portal provides <br />supplemental access for men, equipment, and supplies into the mine. Other openings into the mine include: <br />• Zero -Entry Fan <br />• Fresh Water Borehole <br />• Thickener Underflow Boreholes l and 2 <br />• Rock -Dust Borehole <br />• Fish Creek 1 and 2 Dewatering Boreholes and Ventilation Shaft <br />• Water System Boreholes 1 and 2 <br />• Barricade Chamber access Escape Shaft <br />• 10 -Right Dewatering Boreholes 1 and 2 <br />• Substation No. 11 Power -Drop Borehole <br />• NW Mains Ventilation Shaft and borehole <br />• 6 -Main North Ventilation /Escape Shaft and associated utility boreholes (7) <br />• EMD Ventilation /Escape Shafts (2) <br />• 18 -Right Ventilation /Escape Shaft <br />• 18 -Left Ventilation Intake and Return Shafts <br />• 6 -Right Thickener Underflow Borehole <br />• 7 -Right Thickener Underflow Borehole <br />MR13 -270 2.05 -11.1 11/06/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.