Laserfiche WebLink
I <br />5750 <br />0 <br />��� Shy <br />` • Hoist <br />Compressor <br />generator <br />Scale: 1 25' <br />B-Vent Shaft #2 Facilities <br />I <br />I Revised power routing <br />8/14/2007 <br />2 <br />Revised power routing, added RDH3, etc. <br />2/26/2008 <br />3 <br />Added breathable air hole @ RDH3. <br />1215/2008 <br />4 <br />Added access road off of mine haul road <br />and buildinl. to N2 plant , RDH�3 . <br />9/14/2009 <br />5 <br />Expanded SH-2 pad for topsoil pile. <br />1115/2013 <br />No. <br />ftvixkn <br />Date <br />Ck <br />NO. <br />Revision <br />c;N <br />24" <br />8 - 12" CMP <br />for equiv.) <br />11 <br />0 0 <br />9d, mar <br />es�o <br />,000 ,off <br />Q10PI <br />B-Vent <br />Shaft #2 <br />• <br />g6 _ <br />Wid <br />C-P- B-Vent <br />0 <br />Oil - p Shaft #2 <br />Upland Diversion Hoist <br />Power line Compressors-/ <br />--P --p generator <br />���� �_ � ♦Top �°�� <br />oil <br />ale: <br />Upland Diversion Scale: 1' 50' <br />.0 <br />MIM <br />1Z',CMP <br />compressors <br />Compres Top <br />0 Air Dryer <br />Soil <br />0 Air Dryer <br />RDH-3 <br />silo <br />RDH-3 N2 Generator Blower <br />2 Generator Blower Breathable air <br />injection hole <br />RDH-3/N2 Plant Buildings <br />Breathable Length Width Av. Height Volume <br />air injection Building ffeet ffqLeq ffpLeq (CY) <br />hole,., Compressor bldg #1 28.5 22.5 12 285 <br />Compressor bldg #2 28.5 22.5 12 285 <br />Dryer bldg 12.5 16.5 15 115 <br />N2 Plant container 20 8 8 47 <br />Breathable air blower 12.5 7.5 7.5 26 <br />758 <br />Scale: 1 50' <br />11P <br />& <br />/Z <br />Scale: 1" = 15' -Scale: 1 50' <br />Notes: <br />- See Illustration 53 (153) for culvert hydrologic modeling/sizing calculations. <br />SH-2 Fluid Storage - SH-1 is for concrete transfer to underground workings. <br />- SH-2 is for fluid storage and transfer to underground workings. <br />Bulk tanks to be placed in concrete containment structure sized to hold volume of <br />largest tank plus precipitation. <br />- Road and active surfaces or pads are to be graveled. <br />- B-Vent Shaft #2 to be fenced to preclude public access. <br />—P--P—P— Power line <br />1-8 If CMP <br />Date I Ck <br />---P <br />Escape Hoist <br />Head Frame <br />Concrete lined <br />