My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-08_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2014-01-08_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:48 PM
Creation date
1/8/2014 4:49:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
1/8/2014
Doc Name
Barge Pump System Relocation (TR19) & Droptower 17 Removal (TR20) As-Built Drawings & Certifications
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR20
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ <br />©i <br />�°M• <br />42" 150 LB. FLAT FACE <br />2 3 4 <br />Scale in Feet <br />TYP <br />30" 150 LB. FLAT FACE <br />As Noted <br />SMM <br />12/11/12 <br />1111,11 1- <br />SHEET 3 <br />Al <br />30" HOPE <br />3/13 <br />WELD NECK FLANGE, <br />WELD NECK FLANGE, <br />TAILING LINE <br />ASTM A 181 GRADE 1 <br />64Z'X39" <br />ASTM A 181 GRADE 1 <br />(EXISTING) <br />v <br />BLOCK <br />n <br />LU <br />> <br />ELBOW <br />NOTES: <br />ECCENTRIC <br />< <br />w <br />42" X 30" REDUCER, <br />(RE -USE EXISTING) <br />1. ALL CARBON STEEL CONSTRUCTION. <br />REDUCER ANSI 816.1 <br />ti <br />v <br />REF. DETAIL <br />2. RUBBER LINE 314" THICK WITH NATURAL <br />PLAN <br />THIS DWG. (NEW) <br />GUM RUBBER. <br />30" FLANGE ADAPTER <br />3. PRIME AND PAINT ASSEMBLY AFTER <br />AND BACKING RING (TYP 2) <br />FABRICATION. <br />4. BOLT HOLES TO STRADDLE CENTERLINE. <br />30" FLANGE ADAPTER <br />5. FABRICATE IN ACCORDANCE WITH <br />FLOW <br />AND BACKING RING <br />SPECIFICATION SP- L- PI385. <br />— <br />(EXISTING) <br />I <br />APPROX. 90' <br />�-- <br />42" DR 15.5 HDPE <br />(NEW) <br />2' -10 3/4" <br />30" DR 17 HDPE <br />/ ✓/ � <br />ELEVATION <br />42" FLANGE ADAPTER <br />(NEW) <br />- <br />42" X 30" REDUCER <br />AND BACKING RING <br />42" HDPE ELBOW BLOCK CONNECTION <br />i DErAIL <br />(NEW) <br />PLAr4 VIEW <br />0 1 2 4 6 <br />0 2 4 6 <br />8 <br />Scale in Feet <br />Scale in Feet <br />COVER, 12" MIN. <br />(TAILINGS OR - <br />NATIVE FILL) <br />NOTE: <br />MOUND FILL ON 42" HDPE FOR <br />A MIN. OF 10 FT LENGTH <br />EVERY 50 FT (OR INSTALL <br />CONTINUOUS MOUNDING) o <br />42" HDPE - ABOVE GROUND <br />SECTION <br />0 1 2 3 4 <br />Scale in Feet <br />sw.� arcoaoauhWO �� <br />REPLACE EXCAVATED MATERIAL. <br />COMPACT TO 95% MAX. STANDARD <br />PROCTOR DENSITY <br />42" HDPE <br />*Phis drow%ng together with any and oil additions• N <br />corrections, chonges end Wterotions thereof is the ' <br />property of Climax Mal bdenum Company and is <br />fumished on the express condition Mat it sholl W <br />not be reproduced, copied, lent• or disposed of Z <br />directly or indirectly, nor used for any other W <br />purpose thon for which it is spec%rcaliy fumished W <br />Without the prior Mitten consent of said Climax W <br />Molybdenum Canpony. <br />MATCH EXISTING <br />PIPE DEPTH <br />AND SLOPE <br />COPPER INSTALL CONTINUOUS 12 AWG <br />ON •. �f,,1;•Q <br />OF PIPE. DAYLIGHT AT EXPOSED <br />ENDS. LEAVE MIN. 6 FT OF V� <br />EXPOSED AT EACH END <br />�•II�Q <br />6" J <br />C 42" HDPE - BURIED <br />UsE ..to" <br />0 1 <br />2 3 4 <br />Scale in Feet <br />12/11/12 <br />As Noted <br />GROUND <br />SURFACE <br />TRENCH SIDE SLOPES <br />j AS DICTATED BY SOIL <br />CONDITIONS AND <br />MSHA/OSHA REGULATIONS <br />BED PIPE IN GRANULAR <br />MATERIAL. CONSOLIDATE <br />USING VIBRATORY PLATE <br />COMPACTOR <br />Climax Molybdenum <br />A Freeport-McMoRan Company <br />3700 S. INCA 5TRE <br />W. W. WHEELER ENGLEWOaa, CO 801 1 0 -340 5 <br />6 ASSOCIATES, INC 303- 761 -4130 <br />n „,"r Reaourcea Enq,,..:•s vAx 303- 761.2802 <br />Drop Tower #17 Removal <br />Pipeline <br />Elbow Block Connection and <br />Pipe Installation Details <br />Parsha•, CO <br />DCM <br />12/11/12 <br />As Noted <br />SMM <br />12/11/12 <br />1111,11 1- <br />SHEET 3 <br />Al <br />SW a. <br />3/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.