My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01-08_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2014-01-08_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:48 PM
Creation date
1/8/2014 4:49:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
1/8/2014
Doc Name
Barge Pump System Relocation (TR19) & Droptower 17 Removal (TR20) As-Built Drawings & Certifications
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR20
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.If <br />• <br />I <br />!I <br />Henderson Millwater Barge System <br />2013 Barge Relocation Project <br />for <br />Climax Molybdenum Company <br />Henderson Mill <br />by <br />W. W. Wheeler and Associates, Inc. <br />and <br />Exponential Engineering Inc. <br />DRAWING LIST <br />DRAWING <br />NO. <br />DRAWING DESCRIPTION <br />REV. NO <br />GENERAL <br />5-0-2000 <br />COVER SHEET AND DRAWNG INDEX <br />A <br />5 -1 -2000 <br />OVERALL SITE PLAN- GENERAL ARRANGEMENT <br />A <br />Climax Molybdenum Henderson Mill <br />Parshetl, CO <br />CIVIL <br />5-2 -2000 <br />BARGE CHANNEL PLAN AND PROFILE <br />A <br />5-2 -2001 <br />BARGE CHANNEL SECTIONS <br />A <br />5-2 -2002 <br />PIPELINE PLAN AND PROFILE: BEGIN TO STA. 15+00 <br />A <br />5-2 -2003 <br />PIPELINE PLAN AND PROFILE: STA. 15+00 TO 30+00 <br />A <br />5-2 -2004 <br />PIPELINE PLAN AND PROFILE: STA. 30 +00 TO 45 +00 <br />A <br />5-2 -2005 <br />PIPELINE PLAN AND PROFILE: STA. 45 +00 TO END <br />A <br />5- 2-2006 <br />PIPELINE TRENCH SECTIONS <br />A <br />STRUCTURAL <br />5-32000 <br />BARGE ANCHOR BLOCK- CONCRETE DETAILS <br />A <br />53-2001 <br />BARGE TEE BLOCK- CONCRETE DETAILS <br />A <br />PIPING <br />582000 <br />PIG LAUNCHER- GENERAL ARRANGEMENT <br />A <br />582001 <br />BARGE BLOCK- GENERAL ARRANGEMENT <br />A <br />582002 <br />SPOOL PIECES - GENERAL ARRANGEMENT AND DETAILS <br />A <br />582003 <br />PIPELINE - CLEANOUT AND BARGE BLOCK <br />A <br />s" <br />B Z <br />O <br />L. <br />p > <br />,{ K <br />e <br />NO <br />® <br />core droning together with any and all additions, <br />corrections, changes and alteration= thereof,= the <br />property of Climax Molybdenum Company and is <br />furnished on the express condition that it shall <br />not be reproduced, copied, lent, a disposed of <br />directly or indirectly, nor used for any other <br />purpose than for Which if is specifically famished <br />MtA without the prior Written consent Of said Climax <br />Molybdenum Company.' <br />rn <br />o <br />w <br />z <br />w <br />W <br />W <br />ol <br />= Climax Molybdenum <br />e <br />A Freeport-McMoRan Company <br />2013 BARGE RELOCATION PROJECT <br />Climax Molybdenum Henderson Mill <br />Parshetl, CO <br />0 <br />PROJECT COVER SHEET <br />DCM <br />01/13 <br />_ <br />`t <br />AS Noted <br />A <br />A <br />37GD B. INCA J^TRCET <br />W. W, WHEELER ENa�ew000. CO BC 110-3405 <br />A ASSOCIATES. INC 303-761-4130 <br />w,.r�.. aa.o,,.�s. .,.. rn x 303 - 761 -2e02 <br />GENERAL LOCATION MAP <br />JMMv <br />ACC ° " <br />... <br />01/13 <br />DRAWING NO. <br />5 -0_'2000 <br />Q <br />Q <br />AND DRAWING INDEX <br />
The URL can be used to link to this page
Your browser does not support the video tag.