Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one). <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />-0 F 1 Rangeland(RL) � Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) F] Recreation(RC) Industrial /COmmercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary resent land use check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />II Rangeland(RL) _ Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR <br />P ) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): _ <br />Open pit dry mining using scapers, loaders, and excavators <br />15. On Site Processing. I I Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Portable on -site processing plant including crushing and screening and portable asphalt plant <br />List any designated chemicals or acid - producing materials to be used or stored within permit area- <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />