Laserfiche WebLink
/ ~` ` <br />~ \ \ <br />` � \ <br />\ \ <br />. \ <br />/ ( ` <br />� \ <br />� <br />> <br />\ <br />\ \ <br />\ <br />\ �r <br />- - - - - - - - - - - - - - - <br />on <br />an <br />TUCKE an <br />R PIT-/ <br />am--mmm, OW SETBACK <br />am <br />an mom <br />APPROXIMATE <br />MINING LIMITS APPROXIMATE_------ <br />MINING LIMITS <br />El APPROXIMATE <br />MINING LIMITS <br />7/* /* MINING <br />1,,BURIED GAS LINE <br />(PLATTE RIVER PHASE 11 <br />POWER AUTHORITY) <br />OVERHEAD HIGH <br />VOLTAGE LINE <br />\ <br />BURIED TELEPMOWE-� <br />/ 8c FIBER OPTICS LINES <br />(NUNN TELEPHONE CO.) <br />` <br />/ <br />�~~ <br />/ <br />� <br />� <br />/ <br />/ <br />\ <br />\ - <br />/ <br />~~ <br />/ <br />/ <br />\ <br />/ <br />�] <br />0z <br />-~' [- <br />- <br />[] O <br />^~ <br />/u uvS""" <br />PRPA EASEMENT <br />SETBACK <br />\ <br />40' HALF ROW � <br />| / <br />WELD C.R. 17 <br />(MELD COUNTY) <br />| | <br />| <br />/ | <br />| ( <br />| <br />A <br />|p | <br />U ' <br />/ | <br />�| | <br />\ \ <br />\ <br />) , <br />\ <br />\ <br />\� <br />R <br />(WELD COUNTY) <br />� <br />\ <br />| \ <br />/ <br />/ <br />/ <br />'-_- C.R. 17 / <br />(WELD COUNTY) <br />� <br />� <br />/ <br />/ <br />/ <br />/ <br />� <br />/ <br />/ <br />/ <br />� <br />/ <br />| � <br />/ <br />/ <br />/ <br />/ \ PP <br />/ \ <br />/ \ <br />� <br />� <br />APPROXIMATE , <br />MINING LIMITS �M|N.__��l <br />SETBACK <br />- | <br />| ' <br />. '.- <br />. / <br />C*LE nouuE <br />PAD RIPPED,| <br />\ <br />. /m~ SOILED | <br />AND SEEDED . \ <br />| / <br />| ,.^ <br />. / <br />-- | <br />� . <br />�- \._---- ._- | <br />' - - <br />RIPPED, SCARIFIED, ' ) <br />` - - TOP SOILED & SEEDED ^ | <br />/\ _ -_--- _ ------ <br />MAINTENANCE BUILDING-� <br />REMOVED, PAD RIPPED, <br />SCARIFIED, TOP SOILED -` r <br />AND SEEDED { ' <br />/ <br />\ <br />SITE ENTRANCE <br />APPROXIMATE <br />m -^` <br />W|N|NG LIMITS \` <br />M vim <br />EME-J.0 ow <br />OVERHEAD UTILITY LINE <br />17-1 ED (POUDRE VALLEY REA) <br />BURIED TELEPHONE <br />& FIBER OPTICS LINES <br />(NUNN TELEPHONE CO.) <br />SETBAC <br />llr� M, <br />300 O JOO 608 QOU <br />( <br />IN FEET ) <br />1 k`oh 300 ft. <br />LEGEND: <br />PERMIT BOUNDARY <br />EXISTING ROAD <br />EXISTING 5 FOOT CONTOUR --8010-- <br />EXISTING 25 FOOT CONTOUR -------805O-- <br />PROPOSED 5 FOOT CONTOUR ----------8071--- <br />PROPOSED 25 FOOT CONTOUR --------8070--- <br />NOTES' <br />1 The proposed final land use for the Connell Carr Pit is <br />�3' Reclaimed mine pit om*./dopcx will be created from bockfiU with <br />overburden und, if necessary, o combination of "cut and fU|^ so <br />as to preserve overburden for use in establishing o plant <br />growth medium elsewhere in the reclamation. <br />I All available topsoil and overburden material will be used for <br />book0|ing. <br />4. Although reclaimed a|opoo will be grodad to JH:lV or shallower <br />where pouuib|e, no slopes will be nydoimod any steeper than <br />2H:1\( <br />5. Grading will blend the pit floor into the Lone Tree Creek <br />drainage system such that otonnwoter will drain freely. <br />S. The growth medium for rovegetotion will be o combination of <br />overburden and topsoils. <br />7. The seed mixture for the proposed permit area is the some as <br />U for the current permitted Tucker Pit (W-1980-002) site and in <br />listed below. <br />Revegetation Seed Mix <br />Rate <br />Buffalo Grass <br />3 <br />TOTAL <br />9 <br />Rates are for drill seeding. If broadcast seeding is <br />used, double seeding rates. <br />K Periodic inspection for noxious weeds, otleast once oyear <br />oody in the season, will be done on pod of o weed <br />management plan. <br />8. The mine office/scale house trailer, maintenance bui|ding, <br />portable processing facility, asphalt p|nnt, and any other <br />structures associated with mining will be removed from the site <br />during final reclamation activities. <br />10. Best Management Practices will be used to control erosion and <br />sto/mwnter suspended sediment runoff from the site during <br />reclamation activities. <br />25' MIN <br />RECLAIMED SLOPE <br />�Z) K | // <br />o �S�R�GR0UND <br />^� <br />^^~" <br />MINING FLOOR <br />� <br />� <br />�� <br />�� <br />�� <br />�� <br />N z <br />TYPICAL CUT AND FILL RECLAMATION <br />25 MUo-'� <br />OVERBURDEN <br />BACKFILL MATERIAL <br />RECLAIMED SLOPE < <br />-HISTORIC GROUND <br />N �~~ <br />/-MINING H|GHWALL m <br />TYPICAL BACK 1 - RECLAMATION <br />�. <br />�--- UUU <br />TOP SOIL CN <br />... �~� <br />MINING FLOOR <br />Z) <br />�� <br />N <br />�� <br />N ~�� <br />cm <br />C) <br />� m <br />��o <br />(0 Ui <br />� <br />1= <br />B <br />� <br />�M 8 <br />�d� <br />-1-0 <br />:3 <br />- <br />0 <br />�� <br />=~ <br />Ljj <br />� <br />~°�� <br />NN <br />NN <br />�� <br />�� <br />�� <br />�� <br />z <br />Un 8 <br />�� <br />���� <br />���� <br />�� <br />^ ~ <br />NN -� <br />m�K <br />�� <br />�U <br />�� <br />- <br />= <br />Date: December, 2013 <br />Job No: 590-003 <br />Drawn: C. Snowdon <br />Design: B. Schenderlein <br />Checked: B. SCHENDERLIEINI <br />Scale: 1 3001 <br />