Sec. 1: All
<br />Sec. 2: All
<br />Sec. 3: Lots 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, SV2SWI/
<br />Sec. 4: Lots 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, S'hS' /2
<br />Sec. 5: All
<br />Sec. 6: All
<br />Sec. 7: All
<br />Sec. 8: All North of the Centerline of the River and Town of Somerset
<br />Sec. 9: All North of the Centerline of the River
<br />Sec. 10: All North of the Centerline of the River
<br />Sec. 11: Lots 1, 2, 3, 4, 5, 6, 7, 8, Lot 9 North of the Centerline of the River,
<br />NWl /SEl/ North of the Centerline of the River,
<br />N1/2SWI/ North of the Centerline of the River,
<br />NW' /SWl/ North of the Centerline of the River
<br />Sec. 12: Lots 1, 2, 3, 4, 5, 6, 7, and 8 North of the Centerline of the River, SV2NW' /,
<br />SWI /NEI /<,
<br />and NWI/ SW 1/ North of the Centerline of the River
<br />Sec. 17: NEl /NWl /, and NWl /NE1 /, North of the Centerline of the River and Town of
<br />Somerset
<br />Township 13 South, Range 91 West, 6th PM -
<br />Sec. 1: All
<br />Sec. 2: Lots 1, 2, 3, 4, SV2NW1/ SY2NEI /, SEl /, N %2SW1/
<br />Sec. 3: Lots 1, 2, 3, SIhNE1 /, N1 /2SEI/
<br />Sec. 11: E1/2NEI/
<br />Sec. 12: All
<br />Sec. 13: Lot 1, N %2NE1/
<br />B. The term of this permit will expire on October 11, 2018.
<br />C. This permit is issued subject to the following conditions and agreements:
<br />1. Operator agrees to be bound by all lawful requirements of the Colorado Surface
<br />Coal Mining Reclamation Act (C.R.S. 34 -33 -101 et seq.) ( "the Act "), all lawful
<br />rules and regulations thereunder, as amended from time to time, and all provisions
<br />of this permit.
<br />2. Permittee shall take all possible steps to minimize any adverse impact to the
<br />environment or public health and safety resulting from noncompliance with any
<br />term or condition of the permit, including, but not limited to:
<br />a. Any accelerated or additional monitoring necessary to determine the nature
<br />and extent of noncompliance and the results of the noncompliance;
<br />b. Immediate implementation of measures necessary to comply; and
<br />
|