Laserfiche WebLink
COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Hayden Gulch Loadout, Hayden Gulch Terminal, LLC <br />Permit No. C- 1992 -081 <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided <br />there are no objections, the decision will become effective upon the termination of the ten (10) day <br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 10 <br />Submittal Date: February 14, 2013 <br />Decision: Approve with conditions <br />Decision Date: December 17, 2013 <br />Description of Revision: This Technical Revision provides permit updates required for permit <br />renewal no. 4 (RN4). <br />Stipulation(s) attached; Provide authorized signature and return the form to the Division <br />DIVISION OF RECLAMATION, MINING AND PERMITTEE <br />SAFETY <br />Ax <br />Authorized Representative - Division <br />RE AVED <br />Date: December 20, 2013 <br />Date: ,7,4 <br />J 7 2014 <br />�ru <br />REVISED TOTAL ACREAGE <br />DMc!�.ti'.._ DECLAMATION <br />COLORADO <br />RECLAMATION <br />COLORADO DMSIOTOWOCL•AMATION, MINING AND SAFETY <br />MI &— <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 <br />SAFETY <br />$1,203,940.32 <br />COAL MINING PERMIT - TECHNICAL REVISION DECISION <br />Hayden Gulch Loadout, Hayden Gulch Terminal, LLC <br />Permit No. C- 1992 -081 <br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided <br />there are no objections, the decision will become effective upon the termination of the ten (10) day <br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii). <br />Technical Revision No. 10 <br />Submittal Date: February 14, 2013 <br />Decision: Approve with conditions <br />Decision Date: December 17, 2013 <br />Description of Revision: This Technical Revision provides permit updates required for permit <br />renewal no. 4 (RN4). <br />Stipulation(s) attached; Provide authorized signature and return the form to the Division <br />DIVISION OF RECLAMATION, MINING AND PERMITTEE <br />SAFETY <br />Ax <br />Authorized Representative - Division <br />Authorized Representative - Permittee (if applicable) <br />Date: December 20, 2013 <br />Date: ,7,4 <br />CHANGE IN ACREAGE <br />REVISED TOTAL ACREAGE <br />PERFORMANCE BOND <br />Disturbed: 0.00 <br />Disturbed: <br />202.10 <br />Prior Liability: <br />$1,203,940.32 <br />Affected: 0.00 <br />Affected: <br />202.10 <br />Change in Liability: <br />($61,737.32) <br />Permit: 0.00 <br />Permit: <br />391.30 <br />Revised Liability: <br />$1,142,203.00 <br />State: 0.00 <br />State: <br />90.30 <br />Bond Held: <br />$1,203,940.32 <br />Federal: 0.00 <br />Federal: <br />0.00 <br />Private: -0.10 <br />Private: <br />300.90 <br />REVISED APPLICATION PAGES <br />Tab 1: Pages 6, 7, 8, 9 Tab 2: Attachment 2 -2, <br />page 2.2-4 Tab 3: page 9, 10, Attachment 3 -4, <br />Appendix 3 -1 pages 3 -1, 3 -1.1, 3 -1.2, 3 -1.3 & 3- <br />1.4 Tab 7: pages ii, 1, Well abandonment Report <br />for HG Shallow Well 1. Tab 11: table of contents. <br />REVISED MAPS <br />Exhibit 3 -2: Hayden Gulch, Tie Across Haul Road <br />Mineral Ownership and Control. <br />