COAL MINING PERMIT - TECHNICAL REVISION DECISION
<br />Hayden Gulch Loadout, Hayden Gulch Terminal, LLC
<br />Permit No. C- 1992 -081
<br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided
<br />there are no objections, the decision will become effective upon the termination of the ten (10) day
<br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii).
<br />Technical Revision No. 10
<br />Submittal Date: February 14, 2013
<br />Decision: Approve with conditions
<br />Decision Date: December 17, 2013
<br />Description of Revision: This Technical Revision provides permit updates required for permit
<br />renewal no. 4 (RN4).
<br />Stipulation(s) attached; Provide authorized signature and return the form to the Division
<br />DIVISION OF RECLAMATION, MINING AND PERMITTEE
<br />SAFETY
<br />Ax
<br />Authorized Representative - Division
<br />RE AVED
<br />Date: December 20, 2013
<br />Date: ,7,4
<br />J 7 2014
<br />�ru
<br />REVISED TOTAL ACREAGE
<br />DMc!�.ti'.._ DECLAMATION
<br />COLORADO
<br />RECLAMATION
<br />COLORADO DMSIOTOWOCL•AMATION, MINING AND SAFETY
<br />MI &—
<br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567
<br />SAFETY
<br />$1,203,940.32
<br />COAL MINING PERMIT - TECHNICAL REVISION DECISION
<br />Hayden Gulch Loadout, Hayden Gulch Terminal, LLC
<br />Permit No. C- 1992 -081
<br />The Division of Reclamation, Mining and Safety has proposed the decision stated below. Provided
<br />there are no objections, the decision will become effective upon the termination of the ten (10) day
<br />public comment period, in accordance with Rule 2.08.4(6)(b)(iii).
<br />Technical Revision No. 10
<br />Submittal Date: February 14, 2013
<br />Decision: Approve with conditions
<br />Decision Date: December 17, 2013
<br />Description of Revision: This Technical Revision provides permit updates required for permit
<br />renewal no. 4 (RN4).
<br />Stipulation(s) attached; Provide authorized signature and return the form to the Division
<br />DIVISION OF RECLAMATION, MINING AND PERMITTEE
<br />SAFETY
<br />Ax
<br />Authorized Representative - Division
<br />Authorized Representative - Permittee (if applicable)
<br />Date: December 20, 2013
<br />Date: ,7,4
<br />CHANGE IN ACREAGE
<br />REVISED TOTAL ACREAGE
<br />PERFORMANCE BOND
<br />Disturbed: 0.00
<br />Disturbed:
<br />202.10
<br />Prior Liability:
<br />$1,203,940.32
<br />Affected: 0.00
<br />Affected:
<br />202.10
<br />Change in Liability:
<br />($61,737.32)
<br />Permit: 0.00
<br />Permit:
<br />391.30
<br />Revised Liability:
<br />$1,142,203.00
<br />State: 0.00
<br />State:
<br />90.30
<br />Bond Held:
<br />$1,203,940.32
<br />Federal: 0.00
<br />Federal:
<br />0.00
<br />Private: -0.10
<br />Private:
<br />300.90
<br />REVISED APPLICATION PAGES
<br />Tab 1: Pages 6, 7, 8, 9 Tab 2: Attachment 2 -2,
<br />page 2.2-4 Tab 3: page 9, 10, Attachment 3 -4,
<br />Appendix 3 -1 pages 3 -1, 3 -1.1, 3 -1.2, 3 -1.3 & 3-
<br />1.4 Tab 7: pages ii, 1, Well abandonment Report
<br />for HG Shallow Well 1. Tab 11: table of contents.
<br />REVISED MAPS
<br />Exhibit 3 -2: Hayden Gulch, Tie Across Haul Road
<br />Mineral Ownership and Control.
<br />
|