Laserfiche WebLink
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize/Demobilize Equipment for Initial Reclamation <br />Site: McClave Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 036 State: Colorado <br />Date: 12/31/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Page 1 of 3 <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -036 <br />Shift basis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON- HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT TRAILER <br />(25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities <br />0 -25 Tons <br />26 -50 Tons <br />51+ Tons <br />Ownership Cost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />Operating Cost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />Operator Cost/Hour: <br />$27.66 <br />$27.66 <br />$27.66 <br />Helper Cost/Hour: <br />$0.00 <br />$25.39 <br />$25.39 <br />Total Unit Cost/Hour: <br />$88.67 <br />$117.55 <br />$125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Owner ship <br />Haul Rig <br />Fleet <br />Haul Trip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/ unit <br />Cost/hr /unit <br />Size <br />Cost/hr/ <br />Cost/hr/ fleet <br />Cost/ fleet <br />$84.73 <br />(TONS) <br />$84.73 <br />$84.73 <br />Flatbed Truck, 6x4, 45K GVW <br />fleet <br />1 <br />$101.66 <br />Cat D9T - 9SU <br />66.13 <br />$78.33 <br />$125.45 <br />1 <br />$203.78 <br />$125.45 <br />$250.00 <br />ATLAS COPCO <br />1.25 <br />$39.19 <br />$88.67 <br />1 <br />$127.86 <br />$88.67 <br />$250.00 <br />ROC D3- 01,3.0 in. <br />Cat 324D L 9' -8" <br />27.33 <br />$31.12 <br />$117.55 <br />1 <br />$148.67 <br />$117.55 <br />$250.00 <br />Stick <br />Cat 627G <br />41.80 <br />$63.31 <br />$117.55 <br />1 <br />$180.86 <br />$117.55 <br />$250.00 <br />CAT 12M <br />16.01 <br />$24.43 <br />$88.67 <br />1 <br />$113.10 <br />$88.67 <br />$250.00 <br />Drill/Broadcast <br />25.00 <br />$39.59 <br />$88.67 <br />1 <br />$128.26 <br />$88.67 <br />$250.00 <br />Seeder with Tractor <br />Subtotals: 1 $902.537 $626.56 1 $1,500.00 <br />ROADABLE EOUIPMENT: <br />Machine Description <br />Total Cost/hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost/hr/ fleet <br />Return Trip <br />Cost/hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$75.63 <br />1 <br />$75.63 <br />$75.63 <br />Fuel Tanker, 4x2, 170 HP <br />$78.97 <br />1 <br />$78.97 <br />$78.97 <br />Lube Truck, 4x2, 170 HP <br />$84.73 <br />1 <br />$84.73 <br />$84.73 <br />Flatbed Truck, 6x4, 45K GVW <br />$101.66 <br />1 <br />$101.66 <br />$101.66 <br />Light Duty Pickup, 4x4, 1 T. Crew <br />$71.56 <br />1 <br />$71.56 <br />$71.56 <br />Subtotals: $412.55 1 $412.55 <br />CIRCES Cost Estimating Software <br />