Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Midterm 7 <br />Site: McClane Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />008 <br />009 <br />010 <br />011 <br />012 <br />013 <br />014 <br />015 <br />016 <br />017 <br />018 <br />019 <br />020 <br />021 <br />022 <br />023 <br />024 <br />025 <br />026 <br />027 <br />028 <br />Regrade Mine Bench Areas and Reconstruct <br />Ephemeral Drainages <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />165.52 <br />$42,683.75 <br />$1,937.00 <br />$21.00 <br />$414.17 <br />$767.63 <br />$867.00 <br />$6,813.31 <br />$2,562.00 <br />$184.00 <br />$210.00 <br />$2,485.00 <br />$8,283.06 <br />$4,141.75 <br />$457.00 <br />$57,467.26 <br />$3,229.73 <br />$87.00 <br />$3,104.06 <br />$1,610.80 <br />$635.93 <br />$1,342.81 <br />$6,908.97 <br />$922.61 <br />$143.83 <br />$1,150.66 <br />$13,783.56 <br />$1,533.10 <br />$80,585.17 <br />Regrade Steep Slope Area South of Shop <br />EXCAVATE <br />15.74 <br />Recontour East Salt Creek Bridge Area <br />EXCAVATE <br />0.16 <br />Regrade Drill Pad from Minor Revision 37 <br />DOZER <br />1.61 <br />Regrade Construction Material Stockpile <br />DOZER <br />2.98 <br />Spread and Compact Uncompacted Refuse Coal <br />Mine Waste Pile <br />COMPACT <br />6.18 <br />Place Three Feet of Cover on Coal Mine Waste <br />Pile <br />SCRAPERI <br />24.97 <br />Rip Backfilled and Rough Graded Areas <br />RIPPER <br />9.63 <br />Rip McClane to Munger Haul Road <br />RIPPER <br />0.69 <br />Rip Construction Material Stockpile <br />RIPPER <br />0.79 <br />Pull Main Haul Road Fill Material to Base of Cut <br />Slope Bench <br />EXCAVATE <br />20.19 <br />Recontour Main Haul Road Surfaces <br />DOZER <br />32.12 <br />Recontour Main Haul Road Surfaces <br />DOZER <br />16.06 <br />Finish Grade All Backfilled Areas <br />GRADER <br />4.69 <br />Stream Channel Erosion Protection <br />NA <br />24.00 <br />Backfill and Regrade Sediment Pond, Drying Area <br />and Office <br />DOZER <br />12.52 <br />Regrade Diversion Ditches <br />EXCAVATE <br />0.71 <br />Regrade Coal Mine Waste Pile Pond <br />DOZER <br />12.04 <br />Replace Topsoil from Stockpile to Mine Bench <br />Area <br />SCRAPERI <br />5.90 <br />Replace Topsoil from Stockpile to Sediment Pond <br />and Office <br />SCRAPERI <br />2.33 <br />Replace Topsoil from Stockpile to Road from <br />McClane to Munger <br />SCRAPERI <br />4.92 <br />Replace Topsoil from Stockpile to Coal Mine <br />Waste Pile <br />SCRAPERI <br />25.32 <br />Replace Topsoil from Stockpile to Coal Mine <br />Waste Pile Pond <br />DOZER <br />3.58 <br />Replace Topsoil from Stockpile to Minor Revision <br />37 Drill Pad <br />DOZER <br />0.56 <br />Replace Topsoil from Stockpile to Light Use Road <br />DOZER <br />4.46 <br />Seal and Backfill Portals <br />MINESEAL <br />160.00 <br />Seal Monitoring Well GW -1 and MR -37 Borehole <br />BOREHOLE <br />6.00 <br />Demolish and Remove All Structures <br />DEMOLISH <br />330.00 <br />