Demo Worksheet Cont'd Task # TTT Page 2 of 3
<br />Line Power
<br />10'x20'x8'
<br />Bldg. (SN) demo. /on-
<br />1,600.00
<br />CF
<br />$0.19
<br />$304.00
<br />Substation
<br />site disposal in
<br />excavated pit - Max.
<br />10,000 ft. haul
<br />Crusher /Screener
<br />25'xl5'x25'
<br />Bldg. (SN) demo. /on-
<br />9,375.00
<br />CF
<br />$0.19
<br />$1,781.25
<br />site disposal in
<br />excavated pit - Max.
<br />10,000 ft. haul
<br />- Wing Walls
<br />2 (15'x8'x6 ")
<br />Demo. and on -site
<br />240.00
<br />SF
<br />$1.70
<br />$407.76
<br />disposal in existing pit,
<br />6 in. thick - Max.
<br />10,000 ft. haul
<br />- Floor
<br />10'x25'x6"
<br />Demo. and on -site
<br />250.00
<br />SF
<br />$1.70
<br />$424.75
<br />disposal in existing pit,
<br />6 in. thick - Max.
<br />10,000 ft. haul
<br />Collection Conveyor
<br />40 LF
<br />Conveyor, elevated,
<br />40.00
<br />LF
<br />$43.17
<br />$1,726.80
<br />including supports - 5
<br />ft. W x 6 ft. H housing
<br />Stacker Conveyor
<br />110 LF
<br />Conveyor, elevated,
<br />110.00
<br />LF
<br />$43.17
<br />$4,748.70
<br />including supports - 5
<br />ft. W x 6 ft. H housing
<br />10,000 Gallon Water
<br />10,000 Gallons
<br />Excavate and load tank
<br />1.00
<br />EA
<br />$1,230.00
<br />$1,230.00
<br />Tank
<br />onto trailer, non - leaking
<br />- 9,000 gal. to 12,000
<br />al.
<br />Water /Septic Tank
<br />3,750 Gallons
<br />Excavate and load tank
<br />1.00
<br />EA
<br />$528.50
<br />$528.50
<br />onto trailer, non - leaking
<br />- 3,000 gal. to 5,000
<br />al.
<br />3MV Substation
<br />NA
<br />Transformer
<br />1.00
<br />EA
<br />$2,500.00
<br />$2,500.00
<br />- Footers (6)
<br />3'x 1.5'x24 LF
<br />Demo. and on -site
<br />24.00
<br />LF
<br />$15.29
<br />$367.03
<br />disposal in existing pit,
<br />1.5 ft. x 3 ft. - Max.
<br />10,000 ft. haul
<br />- Powerlines and
<br />2,200 LF
<br />Powerline or utility line,
<br />2,200.00
<br />LF
<br />$5.23
<br />$11,501.60
<br />Poles
<br />overhead, wood -
<br />Double or "H" pole
<br />2,000 Gallon Fuel
<br />2,000 Gallon
<br />Excavate and load tank
<br />1.00
<br />EA
<br />$528.50
<br />$528.50
<br />Tank
<br />onto trailer, non - leaking
<br />- 3,000 gal. to 5,000
<br />al.
<br />- Remove Sludge
<br />NA
<br />Remove sludge, water,
<br />1.00
<br />EA
<br />$218.50
<br />$218.50
<br />from Tank Bottom
<br />and rem. product from
<br />tank - 3,000 to 5,000
<br />al.
<br />- Sludge Disposal
<br />Assume 200
<br />Hazardous waste
<br />4.00
<br />DRUM
<br />$441.13
<br />$1,764.52
<br />Gal
<br />removal - Drum
<br />solids /liquids, per drum,
<br />(1 -6 drum job)
<br />- Clean Tank with
<br />30 Pounds
<br />Insert dry ice (CO2)
<br />30.00
<br />LB
<br />$1.64
<br />$49.20
<br />CO2
<br />into tank to produce
<br />inert gas - 1.5 lbs. /100
<br />al.
<br />- Haul Tank to
<br />NA
<br />Haul to Certified Dump
<br />1.00
<br />EA
<br />$660.00
<br />$660.00
<br />Certified Dump
<br />Rock Dust Bin
<br />24'x 15'
<br />Remove Tank
<br />1.00
<br />EA
<br />$2,112.00
<br />$2,112.00
<br />Diameter
<br />Shop Building
<br />40'x80'xl2'
<br />Bldg. (SN) demo. /on-
<br />38,400.00
<br />CF
<br />$0.19
<br />$7,296.00
<br />CIRCES Cost Estimating Software