Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 2 of 3 <br />Line Power <br />10'x20'x8' <br />Bldg. (SN) demo. /on- <br />1,600.00 <br />CF <br />$0.19 <br />$304.00 <br />Substation <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />Crusher /Screener <br />25'xl5'x25' <br />Bldg. (SN) demo. /on- <br />9,375.00 <br />CF <br />$0.19 <br />$1,781.25 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />- Wing Walls <br />2 (15'x8'x6 ") <br />Demo. and on -site <br />240.00 <br />SF <br />$1.70 <br />$407.76 <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />- Floor <br />10'x25'x6" <br />Demo. and on -site <br />250.00 <br />SF <br />$1.70 <br />$424.75 <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />Collection Conveyor <br />40 LF <br />Conveyor, elevated, <br />40.00 <br />LF <br />$43.17 <br />$1,726.80 <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />Stacker Conveyor <br />110 LF <br />Conveyor, elevated, <br />110.00 <br />LF <br />$43.17 <br />$4,748.70 <br />including supports - 5 <br />ft. W x 6 ft. H housing <br />10,000 Gallon Water <br />10,000 Gallons <br />Excavate and load tank <br />1.00 <br />EA <br />$1,230.00 <br />$1,230.00 <br />Tank <br />onto trailer, non - leaking <br />- 9,000 gal. to 12,000 <br />al. <br />Water /Septic Tank <br />3,750 Gallons <br />Excavate and load tank <br />1.00 <br />EA <br />$528.50 <br />$528.50 <br />onto trailer, non - leaking <br />- 3,000 gal. to 5,000 <br />al. <br />3MV Substation <br />NA <br />Transformer <br />1.00 <br />EA <br />$2,500.00 <br />$2,500.00 <br />- Footers (6) <br />3'x 1.5'x24 LF <br />Demo. and on -site <br />24.00 <br />LF <br />$15.29 <br />$367.03 <br />disposal in existing pit, <br />1.5 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />- Powerlines and <br />2,200 LF <br />Powerline or utility line, <br />2,200.00 <br />LF <br />$5.23 <br />$11,501.60 <br />Poles <br />overhead, wood - <br />Double or "H" pole <br />2,000 Gallon Fuel <br />2,000 Gallon <br />Excavate and load tank <br />1.00 <br />EA <br />$528.50 <br />$528.50 <br />Tank <br />onto trailer, non - leaking <br />- 3,000 gal. to 5,000 <br />al. <br />- Remove Sludge <br />NA <br />Remove sludge, water, <br />1.00 <br />EA <br />$218.50 <br />$218.50 <br />from Tank Bottom <br />and rem. product from <br />tank - 3,000 to 5,000 <br />al. <br />- Sludge Disposal <br />Assume 200 <br />Hazardous waste <br />4.00 <br />DRUM <br />$441.13 <br />$1,764.52 <br />Gal <br />removal - Drum <br />solids /liquids, per drum, <br />(1 -6 drum job) <br />- Clean Tank with <br />30 Pounds <br />Insert dry ice (CO2) <br />30.00 <br />LB <br />$1.64 <br />$49.20 <br />CO2 <br />into tank to produce <br />inert gas - 1.5 lbs. /100 <br />al. <br />- Haul Tank to <br />NA <br />Haul to Certified Dump <br />1.00 <br />EA <br />$660.00 <br />$660.00 <br />Certified Dump <br />Rock Dust Bin <br />24'x 15' <br />Remove Tank <br />1.00 <br />EA <br />$2,112.00 <br />$2,112.00 <br />Diameter <br />Shop Building <br />40'x80'xl2' <br />Bldg. (SN) demo. /on- <br />38,400.00 <br />CF <br />$0.19 <br />$7,296.00 <br />CIRCES Cost Estimating Software <br />