Laserfiche WebLink
Task description: Regrad� <br />Site: McClane Canyon Mine <br />PROJECT IDENTIFICATION <br />Task #: 017 <br />Date: 12/30/2013 <br />User: ZTT <br />HYDRAULIC EXCAVATOR WORK <br />Diversion Ditches <br />Permit Action: MT7 <br />State: Colorado <br />County: Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 324D L 9' -8" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -017 <br />Horsepower: <br />186 <br />Weight (MT): <br />24.85 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Capacity <br />Bucket Size Class: Medium <br />Rated Capacity: 2.26 LCY (heaped) <br />Bucket Fill Factor: 0.975 Sand and gravel (95% - 100 %) 0.975 <br />Adjusted Capacity: 2.20 LCY <br />Job Condition Correction Factors Site Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time <br />394.66 LCY/Hour <br />327.57 LCY /Hour <br />327.57 LCY /Hour <br />Unit cost: $0.376 /LCY <br />0.71 Hours <br />Total job cost: $87.00 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: $31.12 <br />NA <br />Operating Cost/Hour: $57.98 <br />100 <br />Operator Cost/Hour: $33.94 <br />NA <br />Total Unit Cost/Hour: $123.05 <br />Total Fleet Cost/Hour: $123.05 <br />MATERIAL QUANTITIES <br />Initial volume: 175 CCY Swell factor: <br />1.330 <br />Loose volume: 233 LCY <br />Source of estimated volume: Division of Reclamation, Mining <br />& Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Basic Job Condition Description: <br />BELOW AVERAGE <br />Secondary Job Condition within Basic Description: <br />AVERAGE <br />Cycle Time Value: <br />0.335 minutes <br />Load Bucket Capacity <br />Bucket Size Class: Medium <br />Rated Capacity: 2.26 LCY (heaped) <br />Bucket Fill Factor: 0.975 Sand and gravel (95% - 100 %) 0.975 <br />Adjusted Capacity: 2.20 LCY <br />Job Condition Correction Factors Site Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Excavator Total job time <br />394.66 LCY/Hour <br />327.57 LCY /Hour <br />327.57 LCY /Hour <br />Unit cost: $0.376 /LCY <br />0.71 Hours <br />Total job cost: $87.00 <br />CIRCES Cost Estimating Software <br />