My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-31_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2013-12-31_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:26 PM
Creation date
1/6/2014 1:48:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
12/31/2013
Doc Name
Midterm Review & Cost Estimate
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
MT7
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Finish Grade All Backfilled Areas <br />Site: McClane Canyon Mine <br />Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Permit/Job #: C1980004 <br />Abbreviation: None <br />Filename: C004 -014 <br />Basic Machine: CAT 12M Horsepower: <br />Ripper Attachment: Multi -Shank Ripper Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Utilization % <br />$24.43 NA <br />$45.38 100 <br />$0.00 0 <br />$27.55 NA <br />$97.36 <br />Total Fleet Cost/Hour: $99.37 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 6.09 <br />Source of estimated acreage: Operator Estimate <br />HOURLY PRODUCTION <br />158 <br />1 per day <br />(CRG) <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading <br />(0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />10.40 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />8.40 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.5273 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.85 (1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.2982 <br />acres /Hour <br />Adjusted Hourly Fleet Production: <br />1.2982 <br />acres /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />4.69 Hours <br />Unit cost: $75.00 per acre <br />Total job cost: <br />$457.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.