Laserfiche WebLink
The reference area was winter grazed starting September 1, 2010 and ending <br />November 26, 2010. 3 -7 horses occupied approximately 7.8 acres. In place of a <br />second cutting WFC opted to have it grazed. Six Horses grazed from October 26 <br />through December 9, 2011. <br />The above referenced areas are depicted in Exhibits 2011 -3 (NH1) and 2011 -15 (NI-12). <br />A total of 247 acres were grazed on the NH2 Permit area. An unknown quantity of deer <br />and elk have frequented the area throughout the year browsing, grazing, and bedding <br />down when not being hunted in the later seasons; December 2011 - February 2011. <br />Irrigation <br />Attachment 2011 -C contains all the monthly farm contractor reports that detail the <br />related activities such as grazing, seeding, watering, etc. This program was not started <br />till July 2011. December 2011 report is not present since the activity was static. The <br />CC Ditch water was turned on April 19'h, irrigation started April 22nd. This time <br />difference allows the ditch to arrive to our diversion and to clear from debris. The CC <br />Ditch water was shut off October 81h. Irrigating was not performed during harvesting <br />operations. These operations took place: <br />1" cutting June 12`h through July 61h (weather delays extended this cutting) <br />2r'd cutting August 10`n through August 31 <br />3rd cutting No 3`d cutting. <br />In general the fields were harvested from west to east, after hay removal, the water was <br />restarted on the individual fields, west to east. Also, the main pump was down for <br />approximately 3 -days due to a turbo failure. (Error on Farm Worksheet: July 2011 <br />Report states that IP irrigation was started 4 -9 -11, it should read 4- 19 -11). <br />6 1 F _. <br />