My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-24_REPORT - C2010089
DRMS
>
Day Forward
>
Report
>
Coal
>
C2010089
>
2013-12-24_REPORT - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:50:52 PM
Creation date
1/6/2014 1:34:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Report
Doc Date
12/24/2013
From
TRI-State Generation and Transmission Association Inc
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Hydrology Report
Email Name
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br />Surface Water Monitoring Sites <br />*These sites will be monitored for four quarters before mining takes place near Meehan <br />Draw and Glasier Draw and for four quarters before the reclamation bond release. <br />* *Surface water information collected at San Miguel River will be the minimum required <br />under 2.04.7 -2. <br />Appendix 2.05.6(3) -3 Page 3 January 2012 <br />Fre uenc <br />Location No <br />Location Description <br />Monthly <br />Quarterly <br />SW -N1 <br />Upper Tuttle Draw <br />Field Parameters <br />Lab <br />SW -N3 <br />Lower Tuttle Draw <br />Field Parameters <br />Lab <br />SW -N200 <br />26 Rd & CC Ditch Crossing <br />Field Parameters <br />Lab <br />SW -N201 <br />26 Rd & Tail Water from Joe Garvey <br />Field Parameters <br />Lab <br />SW -N202 <br />26 Rd & Unnamed Draw to Coal Canyon <br />Field Parameters <br />Lab <br />SWN -203 <br />26 Rd & Unnamed Draw to Coal Canyon <br />Field Parameters <br />Lab <br />SW -N204 <br />Z Rd Crossing <br />Field Parameters <br />Lab <br />SW -N205 <br />26 1/z Rd Crossing to Mine <br />Field Parameters <br />Lab <br />SW -N207 <br />26 1/2 Rd Ditch Crossing <br />Field Parameters <br />Lab <br />SW -N208 <br />26 1/2 Rd Ditch Crossing to Mine <br />Field Parameters <br />Lab <br />SW -N209 <br />26 1/2 Rd CC Ditch Crossing to Mine <br />Field Parameters <br />Lab <br />SW -N210 <br />26 %2 Rd Ditch Crossing from Carver to <br />Meehan <br />Field Parameters <br />Lab <br />SW -N211 <br />26 Rd Crossing Splitter Box Garvey <br />Field Parameters <br />Lab <br />SW -N212 <br />26 Rd Crossing Tail Water from Garvey <br />Field Parameters <br />Lab <br />SW -N213 <br />26 1/2 Rd Crossing Ny ren Draw <br />Field Parameters <br />Lab <br />SW -N214 <br />AA Rd Crossing Ny ren Draw <br />Field Parameters <br />Lab <br />SW -N215 <br />Unnamed Draw upstream at Meehan <br />Draw Confluence* <br />Field Parameters <br />Lab <br />SW -N216 <br />Unnamed Draw downstream at Meehan <br />Draw Confluence* <br />Field Parameters <br />Lab <br />SW -N217 <br />San Miguel River upstream at Tuttle <br />Draw Confluence* <br />Field Parameters <br />Lab <br />SE -N218 <br />San Miguel River downstream at Coal <br />Canyon Confluence* <br />Field Parameters <br />Lab ** <br />SS -1 <br />Drainage at toe of backfill of the old <br />Nucla Mine <br />Field Parameters <br />Lab ** <br />SS -2 <br />50 yards upstream of SS -1 <br />Field Parameters <br />Lab <br />SS -3 <br />Nucla Mine Highwall <br />Field Parameters <br />Lab <br />*These sites will be monitored for four quarters before mining takes place near Meehan <br />Draw and Glasier Draw and for four quarters before the reclamation bond release. <br />* *Surface water information collected at San Miguel River will be the minimum required <br />under 2.04.7 -2. <br />Appendix 2.05.6(3) -3 Page 3 January 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.