Laserfiche WebLink
L J DEVELOPMENT, INC. <br />256 N. MERRILL DRIVE <br />PUEBLO WEST, CO 81007 <br />PH: 719 - 240 -9424 email: ipg @incasys.com <br />Tyler O'Donnell <br />Environmental Protection Specialist <br />1313 Sherman St, Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />December 26, 2013 <br />RE: THOMECZEK PIT M- 1995 -007 <br />Corrective action Reply Due December 31, 2013 <br />Dear Mr. O'Donnell: <br />RECEIVED <br />DEC 31 201.1 <br />�+nor� <br />w <br />7Y <br />I have been hired by Mr. Thomeczek to develop a final reclamation plan for the Thomeczek Pit <br />M- 1995 -007. After reviewing the files on the Division of Reclamation, Mining and Safety web <br />site, I feel that some additional time to complete a comprehensive reclamation plan would be <br />helpful. Therefore, I respectfully ask for an extension of 6o days. This would give me time to get <br />all the parties together and complete a reclamation plan of action that could be accomplished <br />before June 2014. <br />I have enclosed a letter of Authorization from Mr. Thomeczek allowing me to prepare the <br />documents for the Division of Reclamation, Mining and Safety to review. I would hope that the <br />Division of Reclamation, Mining and Safety would be able to meet with Mr. Thomeczek and his <br />contractor in the near future on site to discuss all the issues and concerns. <br />We understand that the current action deadline is December 31, 2013. Please notify me if this <br />request is acceptable. Thanks for your consideration. <br />Sincerely, <br />Joe Gagliano <br />Enclosure: Letter of Authorization <br />CC: Tom Kaldenbach, DRMS <br />