My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-26_REPORT - M1980189
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980189
>
2013-12-26_REPORT - M1980189
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:20 PM
Creation date
12/30/2013 9:24:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980189
IBM Index Class Name
REPORT
Doc Date
12/26/2013
Doc Name
Report and Map - fee sent previously
From
Rocky Mountain Materials & Asphalt, Inc.
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Permittee Name: <br />Operation Name: <br />Annual Fee Due: <br />Permit Acreage: <br />RECEIVED <br />'tea /0-/"0j' DEC 2 6 2013 Page 2 of 3 <br />DMSION OF RECLAMATION <br />110c Annual Report MINING AND SAFETY <br />Rocky Mountain Materials & Asphalt, Permit Number: M- 1980 -189 i <br />Inc. <br />Yoder Count El Paso <br />$323.00*/ Anniversary Date: October 23, 2013 <br />7.00 Current Bond Amt: $18,955.00 <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). (5T <br />NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. v <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />YES <br />5. <br />Does the mine operate more than 180 days per year <br />", Rule 1.13 to assure that your mine is in compliance. <br />If "NO please review <br />YES d <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />OPERATION? <br />YES eq <br />b) approval for INTERMITTENT <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />2— <br />8. <br />Number of acres that were newly affected during the current report year. <br />9. <br />Number of acres that were reclaimed during the current report year. <br />10. <br />Estimated new acreage to be affected in the next report year. <br />11. <br />Estimated acres to be reclaimed in the next report year. <br />12. <br />Total acres in various sta es of reclamation, since ernnitted mining activities be an: <br />Total <br />Total acres Total acres Total acres acres <br />backfilled: seeded w/ w /topsoil 4r mulched w/ <br />approved mix: replaced: approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />a fertilized w/ b replacement rate (tons): <br />graded: <br />aped fertilizer: depth <br />Seed Fertilizer Mulch <br />application application <br />application <br />method: method: method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.