Laserfiche WebLink
Vegetation Stockpile <br />location <br />Silt fence <br />Intake line <br />3" water pump <br />Water supply line <br />Slope line. All ground inside the slope line will be graded <br />to drain towards the excavated pit. This will be <br />constructed when the vegetation stockpile is removed. <br />Excavated pit <br />Screened rock <br />pile location <br />I Sluice I <br />Deposit stockpile location <br />Vibratory screen <br />General Design Layout of the Boulder Gold <br />