Laserfiche WebLink
December 19, 2013 <br />Horse Gulch Fill Quarterly Inspection Report <br />Fourth Quarter 2013 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />5 <br />6 <br />0 <br />43864 <br />Tonia Marie Perkins <br />�; Z <br />CO PE 43864`�;.•� <br />Mining Engineer <br />�'4i,� •••••••• <br />Trapper Mining, Inc. <br />�r11tiA1ov <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />5 <br />6 <br />0 <br />