My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-19_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2013-12-19_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:20 PM
Creation date
12/23/2013 9:20:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
12/19/2013
Doc Name
Question 24 Response - AR01
From
The Union Milling Company
To
DRMS
Type & Sequence
AR1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rvr� Re-� <br />The Union Milling Company <br />P.O. Box 620490 <br />99" Littleton, CO 80162 -0490 <br />+1.303.947.3499 <br />19 December, 2013 <br />Mr. Michael Cunningham RFr, <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety DEC 19 2013 <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 Division of Keuan ation, <br />Denver, CO 80203 Mining & Safety <br />michael.cunninaham @ state.co.us <br />RE: Leadville Mill; M1990 -057, Amendment Review No.1 — Question 24 Response <br />Dear Mr. Cunningham, <br />Following is Union Milling Company's (UMC) response to Adequacy Review No. 1 question 24. <br />This completes our AR 1 responses. <br />24. The Reclamation Plan calls for conducting geochemical characterization of the tailings <br />prior to placement of the topsoil cap. Please specify the geochemical analyses the <br />Operator intends to conduct. <br />Response: <br />UMC will include the following text addressing geochemical characterization in the <br />Permit Document <br />Initial Testing <br />Prior to accepting each production run ( "Batch ") of toll ore ( "RoM ") to be treated at the <br />mill, UMC will require that it be tested to assure it meets pre- specified Acceptance <br />Criteria. For each Batch, Acceptance Criteria will include testing to assure that RoM: <br />A. Can be economically processed within the operating limits of the mill; and <br />B. Meets mill facility permitted conditions. <br />Acceptance testing will be performed by an independent laboratory before the RoM <br />arrives on -site. The process will be as follows: <br />1. Seller and Buyer agree to "Economic Terms ". E.g. payment based on RoM <br />grade, process recovery, market prices, treatment costs, etc. <br />2. Batch of RoM to be processed is identified. This may, for example, be a <br />specific stope in a mine, or a stockpile of RoM on the surface. <br />3. The Batch is surveyed to determine quantity and to collect a Representative <br />Sample. <br />
The URL can be used to link to this page
Your browser does not support the video tag.