My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-18_REPORT - M2006077
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006077
>
2013-12-18_REPORT - M2006077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:05:01 AM
Creation date
12/23/2013 9:17:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006077
IBM Index Class Name
Report
Doc Date
12/18/2013
Doc Name
Annual Fee/Report/Map
From
Paul Morgan Excavating, Inc.
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,q �2P r <br />110c Annual Report <br />Page 2 of 3 <br />Pemtittee Name: <br />Paul Morgan Excavating, <br />Permit Number. <br />M- 2006-077 <br />Inc. <br />Operation Name: <br />Morgan Pit <br />County: <br />Huerfano <br />Annual Fee Due: <br />$323,00 V <br />Annivers Date: <br />January 31, 2014 <br />Permit A <br />9.90 <br />Current Bond Amt: <br />$8,944.00 <br />According to C.R.S. 34-32.5-116 or 3432 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 'DEG 13, "AG l3 <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Tobd acres in various stages of reclamation since rmitted minin <br />Total acres Total acres Total acres <br />backfilled seeded w/ w /topsoil <br />Total scree Total acres Topsoil <br />graded: _- fertilized w/ replacement <br />anvd fertilizer: depth (ink <br />application apP <br />I lication <br />method: method: <br />activities <br />YES NO <br />YES <br />YES N <br />t4.(30 <br />1.80 <br />0.0 <br />Total acres <br />„4� mulched w/ <br />approved mulch: <br />Mulch application <br />-- rate (tons/ac): B <br />Mulch <br />application --9& <br />method: <br />
The URL can be used to link to this page
Your browser does not support the video tag.