My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-18_REVISION - C1992080
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992080
>
2013-12-18_REVISION - C1992080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:12 PM
Creation date
12/20/2013 9:35:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080
IBM Index Class Name
Revision
Doc Date
12/18/2013
Doc Name
Adequacy Review No. 2
From
DRMS
To
Savage and Savage Environmental
Type & Sequence
RN4
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION REQUIREMENTS <br />Backfdling and Grading <br />All backfilling and grading requirements have been completed at the Carbon Junction <br />Mine. <br />Soil Replacement <br />Soil resources were redistributed contemporaneously following backfilling. Topsoil was <br />returned to the reclaimed area as per the specifications detailed above. Redistributed <br />topsoil was protected from erosion (wind and water) by crimping in straw, or an <br />approved substitute mulch, immediately after it is redistributed. Retopsoiled areas were <br />revegetated immediately during the normal planting season following the redistribution <br />of the soil. <br />Revegetation <br />With the approval of Technical Revision 5, the approved post - mining land uses of the <br />Carbon Junction Mine were changed from wildlife habitat and cropland to industrial and <br />commercial, recreation, and residential. As a result of this change, the criteria under <br />which the success of revegetation will be judged after completion of reclamation changed <br />significantly. Additionally, the goals for the revegetation program changed accordingly. <br />The goal of the revegetation program will now be to establish a vegetation cover <br />adequate to control erosion. To that end, the revegetation plan was amended with the <br />1996 -1997 mid -term review. <br />If conflicts between the approved post - mining land uses and the current reclamation plan <br />arise, or the current revegetation plan conflicts with the goals of the post - mining land use, <br />the reclamation plan will be revised to accommodate the post - mining land uses. <br />Schedule <br />Rvvegetation was implemented immediately following redistribution of soil <br />Seed Mix/Seeding Methods <br />A basic grass and forb seed mixture was used in all areas revegetated after reclamation <br />(Table 5 -6, The goal of the seeding was to establish a <br />vegetation cover adequate to control erosion and minimize weedy species establishment <br />prior to final development of the property. Grasses and forbs were planted using drill <br />seeding and broadcast means. In the case of broadcast seeding, the seeding rates were <br />two times the rate shown in Table 5 -6. No woody plants were planted in the revegetated <br />area. <br />Abridged Permit Document 5 -13 Feb 2013 Permit Renewal <br />
The URL can be used to link to this page
Your browser does not support the video tag.