My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-18_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-12-18_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:11 PM
Creation date
12/19/2013 3:46:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/18/2013
Doc Name
Weekly Constructin Quality Assurance Report - week ending 12/07/2013
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec" <br />Q Highway 67 <br />Ames cleaned soil and hydro- seeding debris from the surface of the Hwy 67 realignment with a power broom. <br />South MSE Wall: <br />No significant construction activities occurred at the South MSE Wall, <br />11) Storm Water Managemen# <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: Production drilling and <br />blasting, VLF /PSSA cut to fill and compaction, perimeter road construction-, Clearing and grubbing and Underground <br />remediation and confirmation drilling, clay (SLF) processing. <br />II) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />SLF: Sample Numbers 72 -S, 73 -S, and 74 -S were obtained during this reporting period. Note that samples with the <br />suffix " -S" indicate the material originated from the Squaw Gulch Borrow Site-, sample numbers lacking the suffix <br />are from the Cameron Site <br />DCF: Sample Numbers 41 was obtained during this reporting period. <br />General Proiect Items <br />Meetings and Discussions: The Weekly Project Status meeting was held on December 4'' between CC &V, Ames, and <br />Amec. <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None. <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Eric Lorenson Date: 7 Dec. 2013 <br />Reviewed By: Date: 1. <br />Tim Burkliard [ <br />Project Resident Manager <br />Phone: 505.975,8655 <br />Approved By: <br />\ <br />P P Date: 12- --I � -- !3 <br />A <br />Page 3 of 6 MLE2 WE 12.7.13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.