My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-19_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2013-12-19_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:13 PM
Creation date
12/19/2013 2:43:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
12/19/2013
Doc Name
Proposed Decision and Findings of Compliance(SL-4)
From
DRMS
To
Seneca Coal Company
Permit Index Doc Type
Findings
Email Name
JLE
DIH
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Channel 006 -NE2 <br />0.23 <br />Channel 006 -E1 (006 Gulch) <br />0.36 <br />Light Use Road LU -lA <br />0.20 <br />Light Use Road LU -1 <br />0.83 <br />Light Use Road LU -3 and 4 <br />2.35 <br />Oil Well Road <br />0.95 <br />Road "J" <br />0.69 <br />Culvert I -1 Area <br />0.03 <br />Scraper Road Exclusion <br />12.10 <br />Total <br />426.66 <br />SL -3 Phase I Bond Release Application <br />The SL -3 release request applied to the 414 acres primarily in the South Extension Area. The <br />Division approved 412.35 acres for Phase I bond release. Specifically excluded were: <br />SL -3 Exclusion Areas <br />Description <br />Acreage <br />Postmining Channel PM -2D <br />.85 acres <br />Postmining Channel PM -4D <br />.80 acres <br />Total <br />1.65 acres <br />SL -2 Exclusion Areas <br />Areas excluded from the SL -2 application that were not requested in the SL -3 application included <br />the "A" Pit Highwall Slump (AKA Pit Ramp Slide Area) and the Oil Well Road (10.37 acres). <br />Areas not requested for Phase I bond release in either the SL -2 or SL -3 applications, and therefore <br />not released at that time included, include the Tie - Across Haul Road (removed from the permit area <br />during PR6), the Mine Entrance Haul Road, the running surface of Road "J" in the South Extension <br />Area, culverts associated with the unreleased haul roads, the powerline light use road (LU -1B), the <br />sediment ponds, and the stock tanks. <br />SL -4 Phase I Bond Release Application <br />The SL -4 application was received by the Division on November 15, 2012 and deemed complete on <br />March 7, 2013. Seneca Coal Company published notice of the bond release application in the <br />Steamboat Pilot once weekly for four consecutive weeks, beginning on January 27, 2013 and <br />ending on February 17, 2013. SCC notified land owners within and adjacent to the mine permit <br />area, the Office of Surface Mining (OSM), the Bureau of Land Management (BLM) and other <br />interested parties of the application for bond release, as required by Rule 3.03.2(1). No comments <br />were received. <br />Due to wintery weather conditions, the bond release inspection was not conducted within the thirty <br />Page 7 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.