Laserfiche WebLink
Susan Burgmaier -2- December 11, 2013 <br />soil stockpile areas. This ditch will flow into existing Culvert H -1 and then offsite. <br />❑ Pond J will be expanded to the West. The adjacent road will be realigned to <br />parallel Pond J. Excess material from the Pond J expansion will be used to <br />construct the adjacent, re- aligned road. <br />The precipitation event used in TR -81 for the West Diversion Ditch #1 was 2.8 ", it <br />should have been 2.6 ". A revised design for the West Diversion ditch, as well as page <br />App. B -2 are included for insertion into Volume IX, Appendix B. <br />There will be an increase in the bond amount with this revision. However, the amount <br />proposed does not exceed the amount of the bond currently held by the Division. <br />For convenience, I have sent a copy directly to Marcia Talvitie in the DRMS Durango <br />office. Please feel free to contact me if you have any questions. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures: <br />Volume I: Pages 2.05 -12, 20 -21 <br />Volume II: Maps 15 -1, 15 -3, 18, 20, 21 -1, 21 -3, 32 <br />Volume III: Exhibit 8 pages EXH. 8 -11, 25 to 25iii, 29iii, 31, 162 to 165, 166 to 171, <br />Volume IX: Pages App. B -2, 64 to 67. Pages EXH. 8 -172 to 180"viii -e will be <br />deleted. <br />Volume XI: Pages 1 -11, Appendix A, Appendix B, Pages App. B -1 to 73, Geotechnical <br />analysis, Figure 1 <br />CC: Marcia Talvitie, DRMS - Durango <br />Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />