My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-12_REPORT - M2006078
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2006078
>
2013-12-12_REPORT - M2006078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:47:17 PM
Creation date
12/18/2013 9:52:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
REPORT
Doc Date
12/12/2013
From
Flatiron Constructors, Inc.
To
DRMS
Annual Report Year
2013
Permit Index Doc Type
Annual Fee/Report
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�/L <br />Build the Best. Be the Best. <br />December 10, 2013 <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Permit No M- 2006 -078 <br />111 Annual Fee Invoice and Annual Report <br />Flatiron Constructors, Inc. hereby submits its 2013 Annual Report for the Camenish <br />Borrow, Pit Number M- 2006 -078. Check Number 00336829 in the amount of $504.00 <br />was previously submitted separately for the 111 Annual Fee {please- see- eepy- of--claec -k <br />thafi- was-previ )usiy-se . � <br />Stripping of overburden material and export of material from the Camenish Borrow Pit <br />began at the beginning of May 2007 for the Colorado Department of Transportation, 1 -25 <br />Widening Project No. IM- 0253 -160. Currently, all mining work has been completed. <br />Reclamation work at the pit is complete with perimeter sealing from the surrounding <br />alluvium with compacted core with approval of compacted clay liner from the State <br />Engineer's Office <br />A site inspection was performed with the Division of Reclamation, Mining and Safety on <br />August 10, 2013. Flatiron is planning to reseed and fertilize in the spring 2014 planting <br />season as weather allows. <br />Sincerely, <br />FLATIRON CONS U RS, INC. <br />Justin DuMond PE <br />Project Manager <br />Cc: Job File <br />c- ec� E 0 Ike <br />RECEPIFD <br />DEC 12 2013 <br />DlvWon of Keuan,a,':;a, <br />Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.