Laserfiche WebLink
Across -slope shape:Linear <br />Gas creek <br />Percent of map unit:5 percent <br />Landform:Flood plains <br />Down -slope shape:Linear <br />Across -slope shape:Linear <br />Any and all topsoil piles will be seeded within a year after they are created with the same <br />rangeland mix shown in the reclamation plan. <br />It is expected that approximately 12 inches of strippable topsoil will be available from the <br />disturbed areas. <br />Tomichi Pit, December 2013 I -5 <br />