Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 58 of 148 <br />Task description: <br />Site: Elk Creek Mine <br />MOTOR GRADER WORK <br />Finish Grade All Disturbed Areas <br />Permit Action: Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 050 State: Colorado <br />Date: 10/3/2013 County: Delta <br />User: BFB <br />Agency or organization name: <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />DRMS <br />Permit/Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -050 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped <br />Source of estimated acreage <br />HOURLY PRODUCTION <br />108.25 <br />2.05 -20; Division Estimate <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Utilization % <br />Ownership Cost/Hour: <br />$37.98 <br />Selected Blade Angle: <br />NA <br />Operating Cost/Hour: <br />$67.74 <br />12.10 <br />100 <br />Ripper Operating Cost/Hour: <br />$0.00 <br />feet <br />Net grading or ripping width per pass: <br />Operator Cost/Hour: <br />$27.55 <br />Unadjusted Hourly Unit Production: <br />NA <br />Total Unit Cost/Hour: <br />$133.27 <br />Total Fleet Cost/Hour: <br />$133.27 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped <br />Source of estimated acreage <br />HOURLY PRODUCTION <br />108.25 <br />2.05 -20; Division Estimate <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish <br />grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site Altitude: 6200 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 <br />1.6527 <br />1.6527 <br />Grader(s) Total job time <br />acres/Hour <br />acres/Hour <br />65.50 Hours <br />Unit cost: $80.64 per acre Total job cost: $8,729.00 <br />CIRCES Cost Estimating Software <br />