Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 51 of 148 <br />Task description: <br />Site: Elk Creek Mine <br />HYDRAULIC EXCAVATOR WORK <br />Lower Power Line Access Road <br />Permit Action: Renewal 6 <br />PROJECT IDENTIFICATION <br />Task #: 041 State <br />Date: 10/3/2013 County <br />User: BFB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 336D L 10' -6" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$42.57 NA <br />$79.15 100 <br />$33.94 NA <br />$155.66 <br />$155.66 <br />Permit /Job #: C1981022 <br />Abbreviation: None <br />Filename: CO22 -041 <br />Horsepower: <br />268 <br />Weight (MT): <br />29.30 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />MATERIAL QUANTITIES <br />Initial volume: 7,500 CCY Swell factor: 1.125 <br />Loose volume: 8,438 LCY <br />Source of estimated volume: Appendix E -1; Map S -038 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty): <br />Load Bucket Capacity <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />AVERAGE <br />AVERAGE <br />0.321 minutes <br />Bucket Size Class: Small <br />Rated Capacity: 1.56 LCY (heaped) <br />Bucket Fill Factor: 0.850 Hard, tough clay (80% - 90 %) 0.850 <br />Adjusted Capacity: 1.33 LCY <br />Job Condition Correction Factors Site Altitude: 6400 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 247.85 <br />Adjusted Hourly Unit Production: 205.72 <br />Adjusted Hourly Fleet Production: 205.72 <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost <br />1 <br />$0.757 <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Excavator Total job time: 41.02 Hours <br />/LCY Total job cost: $6,384.00 <br />CIRCES Cost Estimating Software <br />