Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 3 of 148 <br />140 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />1 <br />10.00 <br />$21,181.14 <br />Total = <br />Reclamation <br />Job superintendent: <br />2,140.74 hrs <br />Total = <br />$140,025.80 <br />141 <br />1 <br />$4,848.50 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />7.14 <br />TOTAL O & P = <br />Removal <br />CONTRACT AMOUNT (direct + O & P) = <br />$3,918,938.72 <br />142 <br />1 <br />$15,346.40 <br />Mobilize/Demobilize Equipment for Site <br />MOBILIZE <br />14.00 <br />Maintenance <br />150 <br />1 <br />$262,282.00 <br />Yearly Site Maintenance <br />SITEMAINT <br />0.00 <br />ENANCE <br />SUBTOTALS: <br />4453.22 <br />$3,342,100.40 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$67,510.43 <br />Performance bond: <br />1.05% <br />Total = <br />$35,092.05 <br />Job superintendent: <br />2,140.74 hrs <br />Total = <br />$140,025.80 <br />Profit: <br />10.00% <br />Total = <br />$334,210.04 <br />TOTAL O & P = <br />$576,838.32 <br />CONTRACT AMOUNT (direct + O & P) = <br />$3,918,938.72 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.61% <br />3.58% <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $180,663.07 <br />$140,298.01 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $897,799.40 <br />TOTAL BOND AMOUNT (direct + indirect) = $4,239,899.80 <br />CIRCES Cost Estimating Software <br />