Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 000 Page 9 of 148 <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />0.786 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.2794 <br />Adjusted unit production: 480.26 LCY/hr <br />Adjusted fleet production: 1440.78 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.666/LCY <br />Total job time: 1.33 Hours <br />Total job cost: $1,280.51 <br />CIRCES Cost Estimating Software <br />