Laserfiche WebLink
-4- <br />12. Primary future (Post - mining) land use (check one): <br />® Cropland(CR) � Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary Dresent land use (check one): <br />Cropland(CR) jaj Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) 7 Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) 7 Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Minin¢: Briefly explain mining method (e.g. truck/shovel): 7 raCK A 0 e° <br />15. On Site Processine: F Crushin Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): X e <br />he re mot d w i �U_ -i rack ko2 <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: zVese % fa-el <br />16. Descrivtion of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />