Laserfiche WebLink
NEW MINE AREA <br />Minor Subtotals <br />- Previous Highwall Sections 9.60 ac. <br />Backfilled, Re- sloped and <br />Re- seeded 9.60 ac. <br />Moderate <br />Manor <br />- New haul road 10.45 ac. <br />- Depleted High Wall Areas with Backfill 0.8 ac. 11.25 ac. <br />And Re- Sloping in Progress <br />Active Mining Area 11.70 ac <br />- Waste Rock Area 1.00 ac. 12.70 ac. <br />Total Affected Area as of 12- 12 ..................... 33.55 ac <br />Total Affected Area as of 12 -11 ..................... 31.45 ac. <br />Additional Affected Area in 2012 Operation ...... 2.10 ac. <br />SUMMARY OF 2012 ACTIVITIES <br />Reclamation hydro- seeding was accomplished on a total of five acres within the <br />new mine and Former Mine "B" during the year. There are no changes to the Former <br />Mine A map (designated "Exhibit A ") and included in the 2003 report, so it is not <br />included with this year's submittal. <br />Haul roads were treated with a lignosite dust suppressant during the year and road <br />base material was also replaced on worn road areas of the roads. <br />2012. Approximately 350,000 tons of gypsum rock were shipped from the mine during <br />3 <br />