My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-12-16_REVISION - M2013064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2013064
>
2013-12-16_REVISION - M2013064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:38:07 PM
Creation date
12/16/2013 2:15:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013064
IBM Index Class Name
REVISION
Doc Date
12/16/2013
Doc Name
Permit Application Adequacy review
From
DRMS
To
Varra Companies, Inc
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 of 6 <br />Varra- Coulson Resource Project <br />Adequacy Review <br />25. Please provide the Division with signed copies of the notarized structure agreements with <br />all owners of the structures on and within 200 feet of the affected area of the site. <br />6.5 Geotechnical Stability Exhibit <br />26. The Division's engineering staff reviewed the slope stability analysis report included with <br />the Varra - Coulson site dated June 27, 2013. A copy of the review memo from TC Wait is <br />attached. <br />27. The Applicant states operations will remain 125 feet or greater from residential structures, <br />not otherwise owned or controlled by the Operator. The mining plan map indicates the <br />Operator will mine within 10 feet of the residence owned by Mr. Jesse Corral. Please <br />explain this discrepancy and consider increasing the offset between Mr. Corral residence <br />and the mining disturbance. <br />28. The Slope Stability Analysis report prepared by AWES, LLC indicates 17 soil borings were <br />drilled from the ground surface to bedrock at the site. Please provide the Division with <br />copies of the boring logs. <br />Please be advised the Varra- Coulson Resource Project application may be deemed inadequate, <br />and the application may be denied on January 3, 2014, unless the above mentioned adequacy <br />review items are addressed to the satisfaction of the Division. If more time is needed to <br />complete the reply, the Division can grant an extension to the decision date. This will be done <br />upon receipt of a written waiver of the Applicant's right to a decision by January 3, 2014 and <br />request for additional time. This must be received no later than the deadline date. <br />If you have any questions, please do not hesitate to call me at 303 - 866 -3567 Ext. 8124. <br />Sincerely, <br />Peter S. Hays <br />Environmental Protection Specialist <br />Enclosures - Colorado Division of Water Resources, History Colorado, Army Corps of Engineers <br />and Mr. Lightsey comment letters, Stability Analysis review memo dated October 17, 2013, <br />Exhibit G review memo by Tim Cazier, P.E. <br />Cc: Tom Kaldenbach - Division of Reclamation, Mining & Safety <br />