My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (6)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 3:06:02 PM
Creation date
12/16/2013 8:58:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Tony Tennyson
Inspection Date
12/10/2013
Email Name
RDZ
DIH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 10, 2013 C-1981-019/Colowyo Coal Mine RDZ <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R -Roads <br /> Y -Availability of Records Y -Reclamation Success <br /> R -Backfill &Grading Y -Revegetation <br /> R -Excess Spoil and Dev.Waste NA - Subsidence <br /> Y -Explosives Y - Slides and Other Damage <br /> R -Fish &Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance Y - Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> N -Other NA - Special Categories Of Mining <br /> NA -Processing Waste R -Topsoil <br /> COMMENTS <br /> A complete inspection was conducted by Rob Zuber of DRMS from December 10, 2013 to December 12, 2013. <br /> The Colowyo employees who participated in the field inspection were Kurtis Blunt and Elliott Russell. The <br /> weather was clear on all days. The ground was covered with snow over most of the mine site,with some drifts of <br /> approximately three feet. The temperatures were too cold for snow melt. <br /> Mining activities in the South Taylor Pit included: <br /> • The highwall mining operation is complete along the south wall of the pit. <br /> • The contractor(ICG ADDCAR Systems, LLC)has moved their equipment and has begun the first <br /> entrance along the east wall. Per conversations with ADDCAR staff,they have encountered steep slopes <br /> (approximately 14 degrees);to date they have progressed to approximately 650 feet into the wall. <br /> • A loader/truck operation was removing F 1 coal. <br /> • Near the southwest corner of the pit, a rig was in use for exploration purposes. <br /> Regarding the highwall mining, Lee Sampson (Colowyo engineer) indicated in the office that the three entries into <br /> the south wall did not exceed 1,200 feet into the wall. <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1; Approximate Original Contour 4.14.2;Highwall Elimination 4.14.1(2)(f); <br /> Steep Slopes 4.14.2, 4.27;Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> In the West Pit,the 103 dragline was moving E seam overburden. <br /> EXCESS SPOIL and DEVELOPMENT WASTE—Rule 4.09 <br /> Placement, Drainage Control; Surface Stabilization: <br /> The West Taylor Fill and the West Pit Fill were viewed from the ponds below them, and no erosion or <br /> other problems were identified. At the top of the West Taylor Fill,trucks were continuing to dump material. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 9 <br />